4
2. Mounting Options
2.1 Coordinator Mounting guidelines
Correct mounting
Before installation a complete site survey
should be completed to indicate the best
coordinator mounting positions.
General guidelines:
•
It is best to mount the Coordinator
at least 1 m up and 1 m away from
wall surfaces to ensure a clear
antenna signal.
Coordinator
ACCEPTABLE
1m or greater
1m or greater
✓
INCORRECT
CORRECT
✓
✗
•
The Coordinator should be sited free
of obstructions and ideally be in line
of sight to the first group of
actuators. The cable run between the
Master Station and coordinator must
be less than 200 m.
•
The Coordinator should be sited
clear of metalwork and any other
antenna cables.
•
The Coordinator must be connected
with screened 3 pair cable.