Cables for smoke an heat vent systems
Wiring plan (Paragon)
230 V, 50 Hz
Seperate electric circuit.
Mark fuses.
to further ones
see line lenghts and cross sections
Drive at smoke
vent opening
SHEV control panel
vent button
ca. 1,2 m above upper
edge firm flooring
smoke vent button
ca. 1,5 m above upper
edge firm flooring
external control
fire detector
FO 1362 or FT 1262
4x 0,8 Ø
8x 0,8 Ø (RT 45)
10x 0,8 Ø (RT 45-LT)
8x 0,8 Ø (RT 45)
10x 0,8 Ø (RT 45-LT)
2x 0,8 Ø
2x 0,8 Ø
OK
OK
rain sensor
4x 0,8 Ø
3x 1,5 mm²
Line lenghts and cross sections
0,5
240
400
1
120
200
1,5
80
130
2
60
100
2,5
48
80
3
40
65
m
m
total current
3 x 1,5 mm²
3 x 2,5 mm²
ZEL RWA STZ 4503-T
English
99.824.61 1.2/06/11
33/84
When selecting and installing the cables, the
regional electrical installation regulations
concerning wiring systems and the necessary
safety equipment, or guidelines on integrity
maintenance of electric lines are observed.
No type designation is given for these cables,
because of a large variety on the market.
Please consult your Roto partner.
Notice:
System voltage 24 V!
Do not run cables with together power lines!
In case of a cable with ground wire (green / yellow)
this must not be used!
Cable and terminal boxes have to be labeled.
Cross section (mm²) =
cable lenght (m) x total current
80
Group cable (control panel - drive)
Line cable (control panel - detector)
At least three wire design:
- 2 wires for the supply of the drive
- 1 wire for line monitoring, on which also the
SHEV high speed (HS) signal is transmitted to the
drive. If DIP switch 4 is ON, the group will in case of
a fault automatically triggered and opens.
The cables are monitored for short circuit and for
interruption. If DIP switch 3 is ON, the group will in
case of a fault automatically triggered and opens.
Содержание ZEL RWA STZ 4503-T
Страница 1: ...ZEL RWA STZ 4503 T RWA Zentrale S 3 SHEV control panel Centrale DENFC RWA centrale p 23 p 43 p 63 ...
Страница 2: ......
Страница 83: ......
Страница 84: ...99 824 61 1 2 06 11 ...