 Safety

FA ROTEX Solaris DrainBack - 09/2016

5

2.4 Instructions for operating safety

2.4.1 Working on the roof

Installation work on the roof may only be 
carried out by authorised and trained persons 
(heating technicians, roofers, etc.) in 
compliance with the relevant Accident 
Prevention Regulations.

Material and tools must be secured against 
falling down.

Barriers must be erected to prevent persons 
from entering the area below the roof where 
the work is being carried out.

2.4.2 Before working on the heating system

All work on the heating system (such as instal-
lation, connection and start-up) may only be 
carried out by authorised and trained heating 
technicians.

Switch off the main switch and secure it 
against unintended switching on when 
carrying out any work on the heating system.

2.4.3 Electrical installation

Electrical installations must only be carried 
out by electrical engineers and in compliance 
with valid electrical guidelines as well as the 
specifications of the energy supply company 
(EVU).

Connect the mains in accordance with 
IEC 60335-1 via a separator device which 
exhibits contact separation in all poles with a 
contact opening distance that provides full 
disconnection in accordance with the condi-
tions of overvoltage category III and a residual 
current circuit breaker (RCD) with a reaction 
time 

 0.2 s.

Compare the mains voltage (230 V, 50 Hz) 
indicated on the nameplate with the supply 
voltage before connecting to the mains.

Before beginning work on live parts, 
disconnect them from the power supply 
(switch off main switch, remove fuse) and 
secure against unintentional restart.

Equipment covers and service panels must be 
replaced as soon as the work is completed.

2.4.4 Installation room, water quality, heating 

and sanitary connection

The requirements on installing the hot water 
storage tank (Sanicube Solaris, Hybridcube, 
GCU compact or HPSU compact,), on the water 
quality as well as the heating and sanitary con-
nection are described in detail in the instructions 
for the hot water tank. It is essential they are 
complied with.

2.4.5 Instruct the owner

Before you hand over the heating system, 
explain to the user/owner how to operate and 
check the heating system.

Document the handover by filling out the 
installation and instruction forms together with 
the owner and sign them.

2.4.6 Relevant national regulations

DIN 1055-4: 2005/ EN 1991-1-4 Wind actions

DIN 1055-5: 2005/ EN 1991-1-3 Snow loads

DIN 18338 Roofing and Roof-Sealing Work

DIN 18451 Scaffolding Work

DGUV Information 208-016

DGUV Information 201-054

DGUV Regulation 112-198

The accident prevention regulations must be 
heeded when working on the roof.

Содержание H26P

Страница 1: ...mpanies ROTEX Solaris Planning and installation instructions DrainBack solar system Valid for the following components Solaris V21P Solaris V26P Solaris H26P Solaris assembly packages GB Edition 09 20...

Страница 2: ...ystems 7 3 3 2 System components for roof mounted systems ADM 9 3 3 3 System components for in roof systems IDM 11 3 3 4 System components for flat roof systems FDM 13 4 Installation 16 4 1 Transport...

Страница 3: ...ir technical training and specialist knowledge Please read this manual carefully and thoroughly before proceeding with the installation and initial start up or modifi cation of the system Comply stric...

Страница 4: ...levant accident pre vention regulations as well as the recognised safety related and occupational health rules 2 3 Use as intended The ROTEX solar system may only be used for solar supported heating o...

Страница 5: ...condi tions of overvoltage category III and a residual current circuit breaker RCD with a reaction time 0 2 s Compare the mains voltage 230 V 50 Hz indicated on the nameplate with the supply voltage b...

Страница 6: ...ne FLS Solaris FlowSensor flow rate measurement PS Solaris operating pump RPS4 Control and pump unit TK Solaris solar panel temperature sensor TR Solaris return flow temperature sensor TS Solaris stor...

Страница 7: ...r unit of an air water heating pump Electronic control The fully electronic ROTEX Solaris R4 control unit ensures op timum utilisation of the solar heat hot water heating heating support and the obser...

Страница 8: ...ble pipe clamps and connecting fittings Extension kit for feed line CON XV CON XV 80 16 42 64 L 8 m UV resistant thermally insulated feed line with integrated sensor cable pipe clamps cable connection...

Страница 9: ...5j Cable tie 5k Solar panel temperature sensor 5l n Extraction tool with inserts for 15 mm and 18 mm 5o Planning and installation instructions 5p Quick instructions 5q Cable connection fitting 5r Roof...

Страница 10: ...escription FIX WD 16 47 03 for corrugated roofing FIX BD 16 47 04 for folded sheet metal roofing 12h Mounting profile beam 12i Quick instructions Fig 3 13 FIX WD 12j Mounting profile beam 12k Quick in...

Страница 11: ...n fitting 5e g Pipe clamps with hangar bolts 5h Single terminal block with equipotential bonding terminal 5i Single terminal block 5j Cable tie 5k Solar panel temperature sensor 5l n Extraction tool w...

Страница 12: ...in strip 10g Bottom left drip off sheet 10h Bottom right drip off sheet 10i Bottom left sight guard plate 10k Bottom right sight guard plate 10l Accessory bag 10m Accessory bag 10n Locking plate 10o...

Страница 13: ...al block with equipotential bonding terminal 5i Single terminal block 5j Cable tie 5k Solar panel temperature sensor 5l n Extraction tool with inserts for 15 mm and 18 mm 5o Planning and installation...

Страница 14: ...exagon nut M8 6m Hexagon nut M8 with locking serration 6n Washer 6o Round head screw M8 6p Quick instructions Fig 3 22 Flat roof frame basic package FB V26P 6g 8x 6f 2x 6e 6 6 c d 6a 6p 6x 6x 10x 4x 1...

Страница 15: ...ut M8 with locking serration 6n Washer 6o Round head screw M8 6p Quick instructions Fig 3 24 Flat roof frame basic package FB H26P 8 8d c 8b 8a 8g x 2 8f 8e 8p x 4 x 4 x 7 x 3 x 4 x 4 6h 6n 6k 6i 6m 6...

Страница 16: ...ses and main switches remove cables and must be secured against inadvertent restarting The components must be stored in such a way that persons are not endangered by them The regulations in the respec...

Страница 17: ...nting rail 2b Solar panel securing clips 4 Solar panel 5 Solar panel connecting elbow return flow 6 Solar panel connecting elbow inflow 7 Sealing plug 8 Solar return flow pipe 9 Solar inflow pipe 10 S...

Страница 18: ...of the inflow pipe is not more than 16 mm a continuous rise of the inflow pipe to the highest point as well as a continuous gradient to the warm water storage cylinder is ensured For pipe runs in whic...

Страница 19: ...M16 glands from inside 7 For on roof mounting Cover the roof penetrations The roof tiles at the side and above must overlap the roof penetration The corrugated flashing must overlap the roof tile und...

Страница 20: ...gs such as roof tiles with very pronounced undulations large differ ences in height sealing problems can occur with the universal roof penetration box In such cases and also with plane tiles or slate...

Страница 21: ...tep 3 CAUTION In order to prevent torsional stresses and fixing difficulties when mounting the solar panels slightly tighten the self locking nuts of the slide blocks align both mounting profiles exac...

Страница 22: ...e system Always fit the expansion joints to the flat solar panels with extreme caution Bring the next flat solar panel in alignment with the connection pipes of the previous flat solar panel when push...

Страница 23: ...Insert the sealing plugs into the open solar panel connection pipes until the retaining clamps audibly click in place These instructions only describe the pipe laying for al ternate end connection wit...

Страница 24: ...sing cable ties Then connect the silicone covered cable inside the roof to the connection cable of the solar panel temperature sensor of the control and pump units WARNING The equipotential bonding do...

Страница 25: ...nducted by ROTEX authorised and trained heating experts Before start up the protective conductor re sistance and proper connection must be checked CAUTION Setting up in frosty conditions can result in...

Страница 26: ...al in compliance with the respective na tional regulations of the country of use is the responsi bility of the user owner Disassembly of the system handling of coolant oil and other parts may only be...

Страница 27: ...EC for correct selection of products for your application contact your dealer Depending on your application and the product selected an additional supplementary heater may have to be installed Tab 6...

Страница 28: ...anently standstill proof and thermo shock tested Minimum collector yield above 525 kWh m2 per year with 40 cloud coverage location W rzburg Tab 6 2 Technical Data Flat Solar Panel Unit Solaris flat so...

Страница 29: ...ssible roof load has been exceeded by the ballast weight secure the solar panel array using a suitable steel rope construction Working angle Wind action kN m2 0 5 0 65 0 8 0 95 1 1 1 2 1 3 Ballast wei...

Страница 30: ...5 60 6 50 7 21 7 48 7 70 3 64 4 23 4 69 4 86 5 00 50 5 11 5 87 6 46 6 68 6 85 3 32 3 82 4 20 4 34 4 45 48 4 72 5 37 5 86 6 04 6 18 3 07 3 49 3 81 3 93 4 01 46 4 41 4 97 5 38 5 53 5 63 2 86 3 23 3 50 3...

Страница 31: ...ial bonding 24 Roof penetration 19 Solar panel temperature sensor 24 M Mounting profile connector 8 Mounting profile rail 7 O Operating mode 7 Outer layer of storage tank 7 P Parallel connection 17 Pr...

Страница 32: ...ROTEX FA ROTEX Solaris DrainBack Subject to change and correction 008 1628844_00 09 2016...

Отзывы: