background image

INSTALLATION AND

OPERATION MANUAL

Q.PEAK DUO XL-G11.2 and Q.PEAK DUO XL-G11.6 solar module series

Valid for Africa, Europe, LatinAmerica, South America

Содержание Q.PEAK DUO XL-G11.2 Series

Страница 1: ...INSTALLATION AND OPERATION MANUAL Q PEAK DUO XL G11 2 and Q PEAK DUO XL G11 6 solar module series Valid for Africa Europe LatinAmerica South America...

Страница 2: ...uch as country specific regulations for pressure equipment operational safety hazardous goods and environmental protection Regulations and requirements specific to the system Any applicable laws and r...

Страница 3: ...andpermitrequirements prior to installation of the solar power system Other applicable documents In addition to this Manual following technical information are relevant DOCUMENT TYPE Product data shee...

Страница 4: ...cessary structural requirements Compliant with local snow and wind loads Properly fastened to the ground the roof or the fa ade Forces acting on the module are relayed to the mounting substructure Ens...

Страница 5: ...th burrs or sharp corners must not be placed near the module backside so as not to touch the laminate under load Ensure that the junction boxes do not touch the mounting structure e g shorts rails bal...

Страница 6: ...dules in the string Parallel Connection Modules may be damaged by the occurrence of reverse currents caused by module defects ground leaks or defective insulation Ensure that the maximum reverse curre...

Страница 7: ...shown Note Module damage may occur Never step on modules Do not subject modules to any mechanical stress Do not allow any objects to fall onto modules 3 INSTALLATION 3 1 SAFETY AND TRANSPORT Danger R...

Страница 8: ...ult in life threatening injuries The danger increases when several modules are connected in series Please be aware of that the entire open circuit voltage is active even at low levels of solar irradia...

Страница 9: ...d skilled personnel see page 3 Ensure correct polarity Use solar cables for the connection at the junction box outlet Only interconnect connectors of the same type and manufacturer Use minimum 4mm2 co...

Страница 10: ...TER INSTALLATION Protective Grounding The modules must be grounded in accordance with the local statutory regulations DANGER Risk of fatal injury due to electric shock Do not attempt to fix any proble...

Страница 11: ...rface damage may occur Remove snow and ice carefully without force e g with a very soft broom Do not scratch off dirt Module cleaning has to be done by qualified personnel according to the state of th...

Страница 12: ...ual solar modules Q PEAK DUO XL G11 2_G11 6_2022 01_Rev01_AU HANWHA Q CELLS AUSTRALIA PTY LTD Suite 1 Level 1 15 Blue Street North Sydney NSW 2060 Australia TEL 61 0 2 9016 3033 FAX 61 0 2 9016 3032 E...