background image

 

BA019BB1021A27 

23 

 

 

 

Fault

 

Possible cause

 

Action

 

Fan is not rotating or stops 
after a various time. 

No supply voltage present 
or missing of a single 
phase. 

Check the supply voltage 
directly on the fan.  

If not all phases are 

measureable check the-
fuses and the wiring of the 
service switch.

 

Fan turns but there is no 
or not enough airflow. 

Rotation speed of the fan 
too low 

Observe star / delta 
switching

 

Air flow interrupted 

Check duct system  
(e.g. suction, filter, sealing 
caps). 

Calculated pressure does 
not correspond to the real 
value. 

Check fan selection. 

Unfavorable installation 
conditions 

Check the installation situ-
ation.

 

Vibrations / noises in fan. 

Chafing of impeller 

Chafing of impeller. Check 
impeller for dirt and clear-
ance. Check mounting of 
Impeller and inlet cone 

Deformation 

Stop fan immediately. 
Contact Rosenberg sup-
port 

Dirty impeller 

Clean impeller 

Damaged ball bearings 

an impeller. 
Damaged ball bearings. 
Stop fan immediately. 
Contact Rosenberg 
support 

RCD-Switch or fuse trips. 

Ground fault or short 
circuit.

 

Check if the cables are 
damaged or 
moisture is present. 

Defect of the motor 

Contact Rosenberg sup-
port 

 

 

 

 

 

  

 

Содержание DKN-B Series

Страница 1: ...au Gaisbach Tel 49 0 7940 142 0 Fax 49 0 7940 142 125 Email info rosenberg gmbh com www rosenberg gmbh com Betriebsanleitung Operating instruction EHND Ex DKN_ W Ex DKN_ B Ex DVN Ex Explosionsgesch tz...

Страница 2: ...ng field 18 12 Kundendienst Herstelleradresse Service Address of producer 19 13 CE Kennzeichnung CE marking 19 13 1 Konformit tserkl rung Declaration of conformity 19 13 2 Einbauerkl rung Declaration...

Страница 3: ...ben Sie den Ventilator nur bestim mungsgem in den ange gebenen Leistungsgrenzen Typenschild und mit genehmigten F rdermedien The fan must only be used according to its design parameters with regard to...

Страница 4: ...of protection eb with frequency converters It is mandatory to use motors also with temperature class T4 for fans marked with T4 The direction of rotation may be clockwise or anticlockwise The casing E...

Страница 5: ...ist auf 11 kW be schr nkt 4 Der Ventilator ist nicht gasdicht Die Aufstellung der Ventilatoren in Berei chen die mehr als 1 Zone von der Zone des gef rderten Mediums abweichen ist nicht zul ssig Werde...

Страница 6: ...protection switches and posistor tripping units are available as ac cessories Die F rderung von bzw Aufstellung in explosionsf higer Atmosph re ist mit Standardventilatoren verboten Insbesondere wird...

Страница 7: ...0 4 830 4 580 3 990 3 310 2 810 2 680 Baugr e size 450 500 560 630 710 800 900 1000 max Drehzahl speed 1 min 2 450 1 790 1 470 1 360 1 140 1 010 820 690 2 700 2 500 2 050 1 700 1 490 1 250 verst rktes...

Страница 8: ...Ventilator in seiner Originalverpackung trocken und wetter gesch tzt Decken Sie offene Paletten mit Planen ab und sch tzen Sie die Ventilatoren vor Schmutzeinwirkung z B Sp ne Steine Draht usw Halten...

Страница 9: ...ch DIN EN ISO 13857 zu sichern Der ausgepackte Ventilator ist auf Trans portsch den und lose Teile zu berpr fen Besch digte Ventilatoren d rfen nicht mon tiert werden Prevent falling objects and forei...

Страница 10: ...ce maintenance Care should be taken that the gap a between the fan wheel and the fixed housing components is regu lar The minimum distances are shown in the table below Typ Type Baugr e size Spaltma a...

Страница 11: ...ompletely flat An uneven surface will lead to deformation of the base frame so that the impeller cannot rotate free For installation on roof socket or socket damper please use screws and seal rings fo...

Страница 12: ...rommet to ensure a watertight seal and protect the cable from wear Cable lead in always has to be sealed properly The electric supply should be connected to the terminal box which is located un der th...

Страница 13: ...hen Prior to first commissioning check Installation and electrical installation properly completed Safety devices fitted protective guards Assembly residue and foreign particles removed from fan and i...

Страница 14: ...easing can be used These have to be regreased according to the requirements of the manufacturer of the motor Change all non regreasable bearings after 20 000 h Vor jeglichen Arbeiten am Ventilator sic...

Страница 15: ...gs und Wartungsarbeiten ist der korrekte Einbau und die Funktion des Venti lators zu berpr fen Den Hinweisen in Abschnitt 7 Montage ist unbedingt folge zu leisten After each repair and maintenance the...

Страница 16: ...oil and remove this accord ing to the local requirements 4 Transport the machine to a suitable location for disassembly 10 2 Maschine zerlegen Dismantling machine Zerlegen Sie die Maschine nach allge...

Страница 17: ...Kartonagen k nnen ohne weiteres der Werk stoffverwertung zugef hrt werden Verschmutzte Verpackungsmateria lien k nnen einer thermischen Ver wertung zugef hrt werden Plastics Materials and chemicals S...

Страница 18: ...sjahr z B 03 Woche z B 16 year e g 03 week e g 16 of production 6 Kommentarfeld comments field 7 Kennzeichnungsfeld siehe unten identification field see below 8 Typenbezeichnung type designation 11 1...

Страница 19: ...t an Rosenberg products are subject to steady quality controls and are in accordance with valid regulations In case you have any questions with regard to our products please contact either your constr...

Страница 20: ...20 BA019BB1021A27...

Страница 21: ...Betriebsanleitung erw hnt wurden Rosenberg products are covered by the provisions of an incomplete machine Therefore the following declaration of incor poration has been created The declaration of inc...

Страница 22: ...ter Verschlussklap pen Druckverlust entspricht nicht den berechneten Werten Auswahl Ventilator pr fen Ung nstige Einbauverh lt nisse Einbausituation ber pr fen Vibrationen Ger usche im Ventilator Lauf...

Страница 23: ...aling caps Calculated pressure does not correspond to the real value Check fan selection Unfavorable installation conditions Check the installation situ ation Vibrations noises in fan Chafing of impel...

Страница 24: ...24 BA019BB1021A27 15 Inbetriebnahmeprotokoll commissioning protocol...

Страница 25: ...BA019BB1021A27 25 16 Notizen Notes...

Отзывы: