5. Connect the four flexible hoses to the manifolds - ensure that each hose has a rubber washer
inserted at each end to create a watertight seal. Once connected, label each hose with the
corresponding inlet / outlet - this will help easily identify which hose is which during later installation
stages.
6.
At this point it is critical that leak tests are performed.
Connect the valve body to the flexible hoses
- the hot and cold inlets are marked with red and blue paint on the valve. Turn on the water supply and
test the system for leaks. Push the buttons for Outlet 1 and 2 and check all connections are fully sealed.
HOT
COLD
OUTLET 1
OUTLET 2
Figure 4
Figure 5