IMportant prE-InStaLLatIon CHECKS
1. Ensure the bath is completely level.
2. Check for any movement in the bath by standing in it.
3. The walls should be tiled and grouted up to the bath.
4. Fill the bath with water and check the plumbing for leaks.
5. With the bath full of water, fully seal the bath along the tiled wall with a bathroom sealant (not supplied).
6. With the water still in the bath leave the sealant to cure for at least 24 hours.
•
S
pray the seal and joints with the shower head and check for leaks when the silicon has cured.
•
Check the plumbing for leaks.
•
Do not plasterboard over the bath.
• Do not grout the tiles when the bath screen has been fitted, the grout may discolour the aluminium
profiles.
•
Make sure the bath is installed to the manufacturers instructions.