ROLEC OCPP0410 Скачать руководство пользователя страница 7

Product Specification

EVQROCM-01-V03-R0 Installation and Operation Manual

Quantum:EV OpenCharge

January 2022

Page 

6

of 

25

Electrical Specification

Product Code

OCPP0410

OCPP0411

OCPP0420

OCPP0421

OCPP0425

C

Chhaarrg

giinng

g S

So

occkkeett((ss))

1x Type 2

(IEC 62196)

2x Type 2

(IEC 62196)

4x Type 2

(IEC 62196)

AC Charging Output 

1 x 3.6kW

(16A)

1 x 7.2kW

(32A)

2 x 3.6kW

(16A)

2 x 7.2kW

(32A)

4 x 7.2kW

(32A)

Charge Protocol

Mode 3

AC Overload Protection

1x C20A MCB

1x C40A MCB

2x C20A MCBs

2x C40A MCBs

4x C40A MCBs

A

AC

C &

& D

DC

C F

Faauulltt P

Prro

otteeccttiio

onn

1x Type B RCD

2x Type B RCDs

4x Type B RCDs

Input Supply

1x 16A 230V

AC/50Hz

(Single Phase)

1x 32A 230V

AC/50Hz

(Single Phase)

1x 32A 230V

AC/50Hz

(Single Phase)

1x 63A 230V

AC/50Hz

(Single Phase)

2x 63A 230V

AC/50Hz

(Single Phase)

Cable Terminals

3x 50 mm

(2x) 3x 50 mm*

Communications

GPRS (Recommended signal strength of 14 CSQ or better), or 

RJ45 ethernet connection

2x RJ45 

ethernet 

connections

Operating Temperature

-30°C to +50°C

*Alternative cable terminal options available upon request

Product Code

OCPP0412

OCPP0410

OCPP0422

OCPP0423

C

Chhaarrg

giinng

g S

So

occkkeett((ss))

1x Type 2 (IEC 62196)

2x Type 2 (IEC 62196)

AC Charging Output

1 x 11kW

(16A)

1 x 22kW

(32A)

2 x 11kW

(16A)

2 x 22kW

(32A)

Charge Protocol

Mode 3

AC Overload Protection

1x C20A MCB

1x C40A MCB

2x C20A MCBs

2x C40A MCBs

AC & DC Fault Protection

1x Type B RCD

2x Type B RCDs

Input Supply

1x 16A 400VAC

50Hz (3 Phase)

1x 32A 400VAC

50Hz (3 Phase)

1x 32A 400VAC

50Hz (3 Phase)

1x 63A 400VAC

50Hz (3 Phase)

Cable Terminals

5x 50 mm

Communications

GPRS (Recommended signal strength of 14 CSQ or better)

RJ45 ethernet connection

Operating Temperature

-30°C to +50°C

Содержание OCPP0410

Страница 1: ...e and Three Phase Socketed EV Chargers GPRS Ethernet Communication INSTALLATION OPERATION MANUAL MODELS SINGLE PHASE OCPP0410 1 X 3 6kW OCPP0411 1 X 7 2kW OCPP0420 2 X 3 6kW OCPP0421 2 X 7 2kW OCPP042...

Страница 2: ...Three Phase Superfast OCPP0410 OCPP0412 OCPP0411 OCPP0413 OCPP0420 OCPP0422 OCPP0421 OCPP0423 OCPP0425 Document Type Installation and Operation Manual Document Code EVQROCM 01 V03 R0 Language UK Engl...

Страница 3: ...allation Procedure 15 Base Installation If Supplied 15 If a Base is Not Supplied 15 Install the Pedestal 16 Commissioning 18 Commissioning with VendElectric 18 LED Illumination 18 After Installation 1...

Страница 4: ...so by the manufacturer x Do NOT attempt to repair the equipment unless specifically instructed to do so by the manufacturer x To maintain electrical safety the body enclosure of the product access cov...

Страница 5: ...sockets OCPP0412 Quantum EV OpenCharge OCPP 1x 11kW 16A Type 2 socket OCPP0413 Quantum EV OpenCharge OCPP 1x 22kW 32A Type 2 socket OCPP0422 Quantum EV OpenCharge OCPP 2x 11kW 16A Type 2 sockets OCPP...

Страница 6: ...m Polycarbonate x Base Impact resistant 5mm Polycarbonate Mass 32 kg Operating Temperature 30 C to 50 C Operating Humidity Range 5 to 95 Figure 1 General Arrangement and Dimensions NOTE Depending on t...

Страница 7: ...AC 50Hz Single Phase 2x 63A 230V AC 50Hz Single Phase Cable Terminals 3x 50 mm 2x 3x 50 mm Communications GPRS Recommended signal strength of 14 CSQ or better or RJ45 ethernet connection 2x RJ45 ethe...

Страница 8: ...ection BS EN 60529 1992 A2 2013 x Enclosure IP66 x Socket IP54 BS EN62262 2008 x Enclosure IK10 impact rating Plug s Socket s BS EN 62196 1 2014 BS EN 62196 2 2017 Fire Rating UL94 Flame Rating at V2...

Страница 9: ...els may be in the form of adhesive stickers plates and or moulded into the surface of components Information Labels Figure 2 Typical Product Rating Labels Figure 3 Typical Fascia Label Figure 4 RFID a...

Страница 10: ...by someone who is properly qualified and competent to do so in accordance with the current legislation in force in the geographical location of the installation x Advice provided in this manual does...

Страница 11: ...V N INPUT 100 240VAC 0 88A 50 60Hz L V 4 2 T1 4 T2 6 T3 14 NO A2 1 L1 3 L2 5 L3 13 NO A2 A1 SNUBBER ACEN0095 C20 1 2 O OFF ACEO0200 63A I n 0 03A 230V 240V N 1 N 2 T Test Regularly 50 60Hz Im I m 100...

Страница 12: ...0VAC 0 88A 50 60Hz A1 L V 11 A2 12 14 3 2 1 SOCKET 1 SOCKET 2 12V 0V 4 WHITE CABLE 4 12 11 10 10 9 8 7 6 5 2 1 ACEO0200 63A I n 0 03A 230V 240V N 1 N 2 T Test Regularly 50 60Hz Im I m 1000A Inc I c 10...

Страница 13: ...et Quantum EV OpenCharge Schematic EARTH IN ACCORDANCE WITH CURRENT REGULATIONS NOTE The 4x Socket Quantum is effectively two 2x socket Quantums in one pedestal enclosure With the exception of the com...

Страница 14: ...3 5 N 2 4 6 LIVE 1 LIVE 2 LIVE 3 NEUTRAL EARTH A1 A2 WHITE J602 X1 X603 X601 X602 X600 1 7 6 2 4 5 1 3 4 6 WHITE 1 2 3 E CP PP N L3 L2 L1 3 2 1 0V 3 2 1 1 7 6 2 4 4 SDA SCL MOSI MISO IQR GND RST 3 3V...

Страница 15: ...0 1 3 kWh 25 C to 55 C 3X230 400V 0 25 5 80 A 50Hz 1 3 5 7 24 23 21 20 2 4 6 8 A B 1000imp kWh DTS353F 2 EN50470 1 3 kWh 25 C to 55 C 3X230 400V 0 25 5 80 A 50Hz 1 3 5 7 24 23 21 20 2 4 6 8 12V 0V LIV...

Страница 16: ...ckage and or item damage should be provided 4 Make sure the unit model is correct and matches the order NOTE Incorrect or damaged units must NOT be installed Contact your supplier to discuss rectifica...

Страница 17: ...the base and to allow entry of the power and ethernet cable if required 4 Fit the mat over the cables and onto the ground mounting base or the securing points if a base was not supplied 5 Carefully l...

Страница 18: ...nsit and or installation 13 Switch ON the power to the unit and test in accordance with the current legislation applicable in the geographical region of the installation x Make sure this product has b...

Страница 19: ...end of this manual 3 Once commissioning is complete the Host will receive an invitation from VendElectric to set up their Back Office 4 Engage with the customer to install the VendElectric application...

Страница 20: ...to the EV Driver App User Guide included within the charger packaging Status Indicator Guide Flashing blue light Socket Available Flashing green light Socket Available for Plug and Go charging optiona...

Страница 21: ...Charging cables should be routed between the charger and the vehicle so as not to cause an obstruction or trip hazard 4 Charging cables must NOT be left connected to the charger when not in use 5 Cha...

Страница 22: ...r in accordance with applicable regulations for the region of use A typical maintenance inspection and testing schedule is provided on the next page This schedule alternates on a quarterly basis betwe...

Страница 23: ...sical damage x All warning labels present and legible x Status Indicators operating and displaying correct status x If installed check the condition of the charging socket contacts and socket flap x I...

Страница 24: ...ing a service and support agreement with your preferred Installer to ensure you are covered for all potential call out and eventualities THE FOLLOWING STEP IS ONLY REQUIRED IF YOU HAVE PURCHASED THE P...

Страница 25: ...CONTACT US 4 COMPLETE As a part of its services VendElectric will routinely monitor the connectivity and health of the charging points and notify the Host s nominee of any faults or connection issues...

Страница 26: ...Installers Notes Quantum EV OpenCharge EVQROCM 01 V03 R0 Installation and Operation Manual Page 25 of 25 January 2022 Installers Notes...

Страница 27: ......

Страница 28: ...THE UK S LEADING MANUFACTURER OF EV CHARGING POINTS t 01205 724773 e enquiries rolecserv co uk www rolecserv com...

Отзывы: