Installation
EVQROCM-01-V03-R0 Installation and Operation Manual
Quantum:EV OpenCharge
January 2022
Page
16
of
25
Install the Pedestal
IMPORTANT:
All electrical work must be performed in accordance with the current
Electrical Wiring Regulations applicable in the geographical region of the installation.
CAUTION: Equipment Damage
Do NOT use power tools to remove/install panel fixings.
Power tools can damage the fixings, making the panel difficult to remove.
Use hand tools ONLY and do not overtighten fasteners.
CAUTION: Equipment Damage
During the next steps the charger front panel will be removed. Take care to not
damage cables or components.
1. Remove and retain the fixings securing the front panel to the pedestal chassis.
2. Carefully ease the
front
panel away from the unit to gain access to the interior.
CAUTION: Equipment Damage
Fascia panels may be connected to the main assembly by electrical cables. Take
care not to damage, strain, or disconnect the cables. Make sure all connections are
secure before refitting the panel.
3. If required, cut ‘X’ shaped slits in the rubber splash mat to match the mounting
points of the base and to allow entry of the power and ethernet cable (if required).
4. Fit the mat over the cables and onto the ground mounting base or the securing
points if a base was not supplied.
5. Carefully lift the pedestal then lower the chassis over the cables and onto either:
x
the ground mounting base (align the four holes in the chassis with the four studs
of the base).
x
the prepared surface.
6. Route the cables to the appropriate length to be able to connect to the terminals
within the chassis.
7. Secure the chassis to the ground with the correct fixings for the location.
8. Trim around the pedestal base to remove any excess rubber from the splash mat (if
required).
NOTE:
All electrical work must be performed in accordance with the current
legislation applicable in the geographical region of the installation.
CAUTION; Equipment Damage – Sensitive Equipment
If you will be performing insulation resistance tests on the power supply cables, it is
advised to be done BEFORE connecting the cable to the charger. The high voltages
applied during the test may damage sensitive components if tested after the cable is
connected.
9. Terminate the supply cable in the appropriate manner and connect to the
pedestal in accordance with the appropriate schematic.
10. If required, connect the Ethernet cable to the Communications unit.
Installation
Quantum:EV OpenCharge
EVQROCM-01-V03-R0 Installation and Operation Manual
Page
15
of
25
January 2022
Before Installation
IMPORTANT: Signal Strength
Units using GPRS to communicate with a cloud-based back office contain a roaming
SIM card which connects to the strongest signal available.
It is assumed that a suitable GPRS signal has already been verified by the end
user/installer prior to installation.
x
Units using GPRS require a suitable GPRS signal of
14 CSQ
or better.
x
Rolec cannot be held responsible or accountable in the event a GPRS unit is
installed in a location without adequate network signal.
1. Establish a suitable site location for the unit that is both secure and environmentally
safe.
2. Make sure the location meets current legislation (if applicable).
3. Make sure the unit and any accessories have not been damaged in transit.
NOTE
: Items damaged in transit must first be reported to the courier and then to the
supplier.
Where possible, photographic evidence of package and/or item damage should be
provided.
4. Make sure the unit model is correct and matches the order.
NOTE
: Incorrect or damaged units must NOT be installed. Contact your supplier to
discuss rectification.
Installation Procedure
If protective bollards or barriers will be used, consider installing them at the point of site
preparation.
Base Installation – If Supplied:
1. Prepare the ground and set the ground mounting base in the desired location.
x
Make sure the power supply cable and ethernet cable (if required) is fed
upward through the middle of the base.
2. Concrete the base into place and allow time for it to set.
x
The lip of the base should be 2 – 3 mm above the surrounding ground level.
If a Base is Not Supplied:
1. Prepare a suitable area of firm, flat ground.
x
It must be possible to secure the charger to the ground with bolts or similar
fixings that are appropriate to the type of prepared ground.
x
Typically, into concrete, M8 x 100 mm Anchor Bolts should be used but installers
must assess the site and choose the most appropriate fixing for their needs.
x
Make sure the power supply cable and ethernet cable (if required) is fed
upward through the middle of the pedestal mounting location.