Install the Pedestal

IMPORTANT:

All electrical work must be performed in accordance with the current 

Electrical Wiring Regulations applicable in the geographical region of the installation.

CAUTION: Equipment Damage

Do NOT use power tools to remove/install panel fixings. 
Power tools can damage the fixings, making the panel difficult to remove.
Use hand tools ONLY and do not overtighten fasteners.

CAUTION: Equipment Damage

During the next steps the charger front panel will be removed. Take care to not 

damage cables or components.

1. Remove and retain the fixings securing the front panel to the pedestal chassis. 
2. Carefully ease the 

front

panel away from the unit to gain access to the interior.

CAUTION: Equipment Damage

Fascia panels may be connected to the main assembly by electrical cables. Take 

care not to damage, strain, or disconnect the cables. Make sure all connections are 

secure before refitting the panel.

3. If required, cut ‘X’ shaped slits in the rubber splash mat to match the mounting 

points of the base and to allow entry of the power and ethernet cable (if required).

4. Fit the mat over the cables and onto the ground mounting base or the securing 

points if a base was not supplied.

5. Carefully lift the pedestal then lower the chassis over the cables and onto either:

x

the ground mounting base (align the four holes in the chassis with the four studs 

of the base).

x

the prepared surface.

6. Route the cables to the appropriate length to be able to connect to the terminals 

within the chassis.

7. Secure the chassis to the ground with the correct fixings for the location.
8. Trim around the pedestal base to remove any excess rubber from the splash mat (if

required).

NOTE: 

All electrical work must be performed in accordance with the current 

legislation applicable in the geographical region of the installation.

CAUTION; Equipment Damage – Sensitive Equipment

If you will be performing insulation resistance tests on the power supply cables, it is 

advised to be done BEFORE connecting the cable to the charger. The high voltages 

applied during the test may damage sensitive components if tested after the cable is 

connected.

9. Terminate the supply cable in the appropriate manner and connect to the 

pedestal in accordance with the appropriate schematic.

10. If required, connect the Ethernet cable to the Communications unit.

Содержание OCPP0410

Страница 1: ...e and Three Phase Socketed EV Chargers GPRS Ethernet Communication INSTALLATION OPERATION MANUAL MODELS SINGLE PHASE OCPP0410 1 X 3 6kW OCPP0411 1 X 7 2kW OCPP0420 2 X 3 6kW OCPP0421 2 X 7 2kW OCPP042...

Страница 2: ...Three Phase Superfast OCPP0410 OCPP0412 OCPP0411 OCPP0413 OCPP0420 OCPP0422 OCPP0421 OCPP0423 OCPP0425 Document Type Installation and Operation Manual Document Code EVQROCM 01 V03 R0 Language UK Engl...

Страница 3: ...allation Procedure 15 Base Installation If Supplied 15 If a Base is Not Supplied 15 Install the Pedestal 16 Commissioning 18 Commissioning with VendElectric 18 LED Illumination 18 After Installation 1...

Страница 4: ...so by the manufacturer x Do NOT attempt to repair the equipment unless specifically instructed to do so by the manufacturer x To maintain electrical safety the body enclosure of the product access cov...

Страница 5: ...sockets OCPP0412 Quantum EV OpenCharge OCPP 1x 11kW 16A Type 2 socket OCPP0413 Quantum EV OpenCharge OCPP 1x 22kW 32A Type 2 socket OCPP0422 Quantum EV OpenCharge OCPP 2x 11kW 16A Type 2 sockets OCPP...

Страница 6: ...m Polycarbonate x Base Impact resistant 5mm Polycarbonate Mass 32 kg Operating Temperature 30 C to 50 C Operating Humidity Range 5 to 95 Figure 1 General Arrangement and Dimensions NOTE Depending on t...

Страница 7: ...AC 50Hz Single Phase 2x 63A 230V AC 50Hz Single Phase Cable Terminals 3x 50 mm 2x 3x 50 mm Communications GPRS Recommended signal strength of 14 CSQ or better or RJ45 ethernet connection 2x RJ45 ethe...

Страница 8: ...ection BS EN 60529 1992 A2 2013 x Enclosure IP66 x Socket IP54 BS EN62262 2008 x Enclosure IK10 impact rating Plug s Socket s BS EN 62196 1 2014 BS EN 62196 2 2017 Fire Rating UL94 Flame Rating at V2...

Страница 9: ...els may be in the form of adhesive stickers plates and or moulded into the surface of components Information Labels Figure 2 Typical Product Rating Labels Figure 3 Typical Fascia Label Figure 4 RFID a...

Страница 10: ...by someone who is properly qualified and competent to do so in accordance with the current legislation in force in the geographical location of the installation x Advice provided in this manual does...

Страница 11: ...V N INPUT 100 240VAC 0 88A 50 60Hz L V 4 2 T1 4 T2 6 T3 14 NO A2 1 L1 3 L2 5 L3 13 NO A2 A1 SNUBBER ACEN0095 C20 1 2 O OFF ACEO0200 63A I n 0 03A 230V 240V N 1 N 2 T Test Regularly 50 60Hz Im I m 100...

Страница 12: ...0VAC 0 88A 50 60Hz A1 L V 11 A2 12 14 3 2 1 SOCKET 1 SOCKET 2 12V 0V 4 WHITE CABLE 4 12 11 10 10 9 8 7 6 5 2 1 ACEO0200 63A I n 0 03A 230V 240V N 1 N 2 T Test Regularly 50 60Hz Im I m 1000A Inc I c 10...

Страница 13: ...et Quantum EV OpenCharge Schematic EARTH IN ACCORDANCE WITH CURRENT REGULATIONS NOTE The 4x Socket Quantum is effectively two 2x socket Quantums in one pedestal enclosure With the exception of the com...

Страница 14: ...3 5 N 2 4 6 LIVE 1 LIVE 2 LIVE 3 NEUTRAL EARTH A1 A2 WHITE J602 X1 X603 X601 X602 X600 1 7 6 2 4 5 1 3 4 6 WHITE 1 2 3 E CP PP N L3 L2 L1 3 2 1 0V 3 2 1 1 7 6 2 4 4 SDA SCL MOSI MISO IQR GND RST 3 3V...

Страница 15: ...0 1 3 kWh 25 C to 55 C 3X230 400V 0 25 5 80 A 50Hz 1 3 5 7 24 23 21 20 2 4 6 8 A B 1000imp kWh DTS353F 2 EN50470 1 3 kWh 25 C to 55 C 3X230 400V 0 25 5 80 A 50Hz 1 3 5 7 24 23 21 20 2 4 6 8 12V 0V LIV...

Страница 16: ...ckage and or item damage should be provided 4 Make sure the unit model is correct and matches the order NOTE Incorrect or damaged units must NOT be installed Contact your supplier to discuss rectifica...

Страница 17: ...the base and to allow entry of the power and ethernet cable if required 4 Fit the mat over the cables and onto the ground mounting base or the securing points if a base was not supplied 5 Carefully l...

Страница 18: ...nsit and or installation 13 Switch ON the power to the unit and test in accordance with the current legislation applicable in the geographical region of the installation x Make sure this product has b...

Страница 19: ...end of this manual 3 Once commissioning is complete the Host will receive an invitation from VendElectric to set up their Back Office 4 Engage with the customer to install the VendElectric application...

Страница 20: ...to the EV Driver App User Guide included within the charger packaging Status Indicator Guide Flashing blue light Socket Available Flashing green light Socket Available for Plug and Go charging optiona...

Страница 21: ...Charging cables should be routed between the charger and the vehicle so as not to cause an obstruction or trip hazard 4 Charging cables must NOT be left connected to the charger when not in use 5 Cha...

Страница 22: ...r in accordance with applicable regulations for the region of use A typical maintenance inspection and testing schedule is provided on the next page This schedule alternates on a quarterly basis betwe...

Страница 23: ...sical damage x All warning labels present and legible x Status Indicators operating and displaying correct status x If installed check the condition of the charging socket contacts and socket flap x I...

Страница 24: ...ing a service and support agreement with your preferred Installer to ensure you are covered for all potential call out and eventualities THE FOLLOWING STEP IS ONLY REQUIRED IF YOU HAVE PURCHASED THE P...

Страница 25: ...CONTACT US 4 COMPLETE As a part of its services VendElectric will routinely monitor the connectivity and health of the charging points and notify the Host s nominee of any faults or connection issues...

Страница 26: ...Installers Notes Quantum EV OpenCharge EVQROCM 01 V03 R0 Installation and Operation Manual Page 25 of 25 January 2022 Installers Notes...

Страница 27: ......

Страница 28: ...THE UK S LEADING MANUFACTURER OF EV CHARGING POINTS t 01205 724773 e enquiries rolecserv co uk www rolecserv com...

Отзывы: