
Installation
Quantum:EV OpenCharge
EVQROCM-01-V03-R0 Installation and Operation Manual
Page
17
of
25
January 2022
11. Make sure all cable connections are secure and have not become loose or
damaged in transit or during installation.
12. Make sure ALL debris is removed from the front and rear halves of the enclosure
and that no debris is present on any of the components.
NOTE:
Debris and similar pollutants can adversely affect the performance and
working life expectancy of components and will invalidate the product/component
warranty.
IMPORTANT NOTE:
It is the responsibility of the installing engineer to satisfy themselves, that all cable
terminations throughout this product are secure and tight and have not become
loose, strained, or disconnected during transit and/or installation.
13. Switch ON the power to the unit and test in accordance with the current legislation
applicable in the geographical region of the installation.
x
Make sure this product has been installed in compliance with the current
Electrical Wiring Regulations (including recommended earthing arrangements).
14. Make sure you are satisfied that the installation is complete and is in a safe
condition.
CAUTION: Equipment Damage
Do NOT use power tools to remove/install panel fixings.
Use hand tools ONLY and do not overtighten fasteners.
15. Refit the front Fascia panel, taking care not to trap any electrical cables. Secure
the panel with the fixings removed earlier in the procedure.
x
Make sure the rubber washer on the fixing is in
good condition and is correctly placed between
the fascia and the washer.
x
Slight compression of the rubber washer helps to
maintain the water resistance of the pedestal.
x
Do NOT over tighten the fixings.
Rubber
Steel
r
Содержание OCPP0410
Страница 27: ......