4-60
1
3
4-15 TAKE-UP UNIT OPERATION CHECK (Referential Time : 2min.)
This is to check whether Take-up Unit operates properly.
Con
fi
rm that the cable of Take-up Unit is connected to the
connector and turn on the Main Power SW.
Turn on the Sub Power SW while pressing [ ], [ ] and
[ ] keys to enter the Service Mode.
2
MENU
SERVICE MENU
+
MENU
Select [SUB MENU]>[TU CHECK]>[TU].
<Rear View>
[ ]
SUB MENU
TU CHECK
TU
START START
TU CHECK
TU
[ ]
[ ]
[ ]
[ ]
SERVICE MENU
SUB MENU
[ ]
Содержание VS-300
Страница 49: ...2 4 MAIN BOARD_Arrangement Diagram Soldering Side ...
Страница 59: ...2 14 2 3 SERVO BOARD SERVO BOARD_Arrangement Diagram Component Side It indicates the version of the Board ...
Страница 60: ...2 15 SERVO BOARD_Arrangement Diagram Soldering Side ...
Страница 65: ...2 20 2 4 CARRIAGE BOARD CARRIAGE BOARD_Arrangement Diagram Component Side ...
Страница 68: ...2 23 2 5 SUB BOARD SUB BOARD_Arrangement Diagram Component Side ...
Страница 141: ...3 68 7 8 OFF Dispose of the battery Turn off the Sub Power SW and then turn off the Main Power SW Fix the Chassis Cover ...
Страница 257: ...4 59 22 Fix the Right Side Frame by sliding it from behind to hook the tab as shown in the fig ure ...
Страница 279: ...7 2 Unpacking Manual CD ROM DVD ROM etc ...