3-71
9
10
11
8
Screw
Remove the two screws to remove the Tool Carriage Board
Stay from the Tool Carriage Assy.
Loosen the two fi xing screws as shown in the fi gure.
And loosen the Adjustment Screw.
Adjustment Screw
Fixing Screw
< Top View / Left Side of the BELT >
Loosen the four screws as shown in the fi gure.
Remove the Carriage Belt from the plate, and connect the
new belt with the scotch tape.
New Belt
Tape
Carriage Belt
Tool Carriage Board Stay
Содержание VS-300
Страница 49: ...2 4 MAIN BOARD_Arrangement Diagram Soldering Side ...
Страница 59: ...2 14 2 3 SERVO BOARD SERVO BOARD_Arrangement Diagram Component Side It indicates the version of the Board ...
Страница 60: ...2 15 SERVO BOARD_Arrangement Diagram Soldering Side ...
Страница 65: ...2 20 2 4 CARRIAGE BOARD CARRIAGE BOARD_Arrangement Diagram Component Side ...
Страница 68: ...2 23 2 5 SUB BOARD SUB BOARD_Arrangement Diagram Component Side ...
Страница 141: ...3 68 7 8 OFF Dispose of the battery Turn off the Sub Power SW and then turn off the Main Power SW Fix the Chassis Cover ...
Страница 257: ...4 59 22 Fix the Right Side Frame by sliding it from behind to hook the tab as shown in the fig ure ...
Страница 279: ...7 2 Unpacking Manual CD ROM DVD ROM etc ...