![Roland SP-300 Скачать руководство пользователя страница 214](http://html.mh-extra.com/html/roland/sp-300/sp-300_service-manual-book_1481315214.webp)
4-22
4 Adjustment
4
16
- When the M lines are above the K lines, turn the
Adjustment Screw CW.
- When the M lines are below the K lines, turn the
Adjustment Screw CCW.
Adjust the M/Y Head on the basis of the K/C Head.
It is not necessary to adjust the K/C Head.
17
Print the test pattern again.
If the result is NG, repeat 12 ~ 16 .
The shifting of lines should be within 1/2 dot.
Tighten the screws fixing the Head in the reverse order
when fixing with using the TORQUE DRIVER (ST-056).
Torque for tightening is
2kgf • cm (20cNm)
.
Make sure not to tighten the screws firmly.
3
2
1
Содержание SP-300
Страница 128: ...2 Electrical Section 2 2 2 2 2 MAIN BOARD DIP SW DIP SW bit 1 bit 8 Always OFF ...
Страница 134: ...2 Electrical Section 2 8 2 2 3 SERVO BOARD ...
Страница 135: ...2 Electrical Section 2 9 2 ...
Страница 140: ...2 Electrical Section 2 14 2 2 4 HEATER BOARD ...
Страница 189: ...3 Replacement of Main Parts 3 42 3 9 Carry out the LINEAR ENCODER SETUP ...
Страница 203: ...4 11 4 Adjustment 4 Service Report ...
Страница 217: ...4 25 4 Adjustment 4 25 Fix the DAMPER PLATE 24 Fix the HEAD BOARD COVER Clear Cover HEAD BOARD COVER DAMPER PLATE ...