3 Replacement of Main Parts
3-26
3
9
Fix the new PUMP UNIT with the PUMP PLATE. And
then, fix the 2 projection parts of the PUMP top the
holes of the FRAME.
10
Connect the tube of the CAP TOP to the tube of the
PUMP using the JOINT TUBE and connect the tube of
the PUMP to the DRAIN TUBE.
11
Fix the PUMP COVER.
12
Make sure that the Gear of the PUMP UNIT
and the Gear of the PUMP MOTOR mesh
without backlash.
And make sure to set the direction of the
TUBE HOLDER so that open side faces front
and rear.
JOINT TUBE
PUMP TUBE
DRAIN TUBE
You can connect either tube of the CAP TOP
to the either tube of the PUMP.
Move the HEAD CARRIAGE by hand to the lock
position.
PUMP COVER
TUBE HOLDER
Содержание SP-300
Страница 128: ...2 Electrical Section 2 2 2 2 2 MAIN BOARD DIP SW DIP SW bit 1 bit 8 Always OFF ...
Страница 134: ...2 Electrical Section 2 8 2 2 3 SERVO BOARD ...
Страница 135: ...2 Electrical Section 2 9 2 ...
Страница 140: ...2 Electrical Section 2 14 2 2 4 HEATER BOARD ...
Страница 189: ...3 Replacement of Main Parts 3 42 3 9 Carry out the LINEAR ENCODER SETUP ...
Страница 203: ...4 11 4 Adjustment 4 Service Report ...
Страница 217: ...4 25 4 Adjustment 4 25 Fix the DAMPER PLATE 24 Fix the HEAD BOARD COVER Clear Cover HEAD BOARD COVER DAMPER PLATE ...