Installation and Operation
35
User Manual (Hardware) | 2904.4460.02 - 04
Mounting the System into a Rack
CLIPSTER
●
The design of the electrical distribution system must take into consider-
ation the total earth leakage current from all the power supplies in all the
units. The rack may require labeling with “HIGH LEAKAGE CURRENT.
Earth connection essential before connecting supply”.
●
The rack when configured with the units must meet the safety require-
ments of current UL and IEC specifications.
Mounting the System
Perform the following steps:
1.
Make sure the system is unpacked and placed on a flat surface, see
"Unpacking the System" (page 33).
2.
Pull the inner rail out of the slide rail until it clicks and detach the inner
rail completely from the slide rail by pulling the tab forward.
Rack Toppling Over
Racks may topple over due to a massive overweight in the upper part.
Do not slide more than one enclosure out of the rack at a time. When
loading a rack with enclosures, fill from the bottom up; empty from
the top down. Close all enclosures before loading.
Risk of Injury
The weight of the system is around 45kg (99lbs), or more.
Do not attempt to lift the system by yourself, always get others to
assist you.
Содержание CLIPSTER 6 Mk2
Страница 1: ...R S CLIPSTER Mk2 Mastering Station User Manual Hardware Version 04 2904 4460 02...
Страница 16: ...Safety and Regulatory Information FC Declaration of Conformity CLIPSTER 16 User Manual Hardware 2904 4460 02 04...
Страница 76: ...Appendix Packing Instructions CLIPSTER 76 User Manual Hardware 2904 4460 02 04...