Roemheld WM-020-369-10-en BA Скачать руководство пользователя страница 10

  

WM-020-369-10-en

 BA SPEEDY classic 2 balance

.doc

  

 

 

 

 

 

STARK Spannsysteme GmbH – Roemergrund 14 - 6830 Rankweil - Austria 

Tel.:+43 5522 37400-0 - Fax.:+43 5522 37400-700 - e-mail: 

[email protected]

 - 

www.stark-inc.com

  

10/16 

7  Start-up, operating and operation 

 

7.1  On putting into operation for the first time 

 

Visually inspect the entire machine and the fast closing clamp 

Instruct unauthorised personnel to leave the machine 

Check the fill levels of hydraulic oil. 

Check the depth dimension A (see Chapter "8.1 Check

 

dimension

 A

"). 

Check the fast closing clamp for hydraulic and pneumatic sealing. 

 

7.2  Function check 

 

When all clamping elements connected to the same circuit are fitted as described and tightened to 

the appropriate tightening torque, connect the hydraulic pressure generator to the circuit. 

 
 

Release: Slowly and carefully increase the hydraulic pressure to the release pressure. During this 

process check the clamping elements for leaks. If a leak occurs, immediately switch off the pressure 
generator and eliminate the leak. 

 

7.3  Operating and operation 

 

     Only pressurise the fast closing clamp for the changing process. 

Comment : 

do not leave

 the machine under continuous pressurise. 

Adjust the release pressure of the fast closing clamp overpressure safety valve to max. 5 bar 
above the maximum operating pressure. Adjust the operating pressure of the fast closing clamps 

(see Chapter 9 "Specifications"). 
 

 

7.4  SPEEDY with blow-out function 

First apply air pressure 

After approx. 3 s release SPEEDY 

Change pallet / clamp SPEEDY 

Only now switch off air 

 

Ensure an adequate air supply is provided.  

Type:  

Air flow rate l/min 

SPEEDY classic 2 Twister 

80 

 

Содержание WM-020-369-10-en BA

Страница 1: ...mping system Operating Manual WM 020 369 10 en BA SPEEDY classic 2 balance Manufacturer STARK Spannsysteme GmbH Roemergrund 14 6830 Rankweil Austria Tel 43 0 55 22 37400 0 Fax 43 0 55 22 37400 700 E m...

Страница 2: ...ast closing clamp plate 5 4 7 3 Malfunction in the hydraulic system During operation 5 4 7 4 Hazard due to incorrect mounting of the fast closing clamp 6 4 7 5 Hazard due to changes in peripheral spee...

Страница 3: ...intenance of the fast closing clamping device provide important information on the safe and efficient use of the fast closing clamping device 3 2 Presentation of safety instructions Safety instruction...

Страница 4: ...fications defined for normal operation Using as lifting gear and for transporting loads The operator owner bears the sole responsibility for damage due to improper use The manufacturer will not accept...

Страница 5: ...energy on the fast closing clamping device as well as pressure in cylinders and valves after switching off the fast closing clamping device 4 7 1 Spring assembly If the fast closing clamp is dismounte...

Страница 6: ...ipheral speed The fast closing clamp may fracture due to excessive speed excess weight or imbalance and the pallet thrown off Action Comply with specifications and regulations regarding maximum values...

Страница 7: ...p While machining is in progress on one pallet another can be set up in parallel 6 Mounting and installation Fitting and removal instructions for Speedy classic 2 balance and Speedy classic 2 balance...

Страница 8: ...l cage and retaining ring into the centre bore of the piston 5 Fit the locking ring into the disc groove Make sure that the centring diameter surface is not damaged 6 Tighten fast closing clamp to 10...

Страница 9: ...password by e mail Training courses Stark Spannsysteme GmbH provides training courses to train your operators and service personnel Training courses are held on site or at Stark Spannsysteme GmbH Plea...

Страница 10: ...tening torque connect the hydraulic pressure generator to the circuit Release Slowly and carefully increase the hydraulic pressure to the release pressure During this process check the clamping elemen...

Страница 11: ...Verify check dimension with clamping element released There is a check dimension tester to measure the check dimension of every size The tester can be procured from Stark Spannsysteme GmbH Order No 50...

Страница 12: ...must be removed for the cleaning Procedure for cleaning 1 Remove locking ring 2 Carefully lift off retaining ring 3 Remove ball cage 4 Remove spring 5 Clean the parts removed incl housing bore check f...

Страница 13: ...uct with Corrosive or caustic ingredients or Organic solvents such as halogenated or aromatic hydrocarbons and ketones thinners acetone etc as these substances can irreparably damage the seals The ele...

Страница 14: ...guidelines 9 Specifications SPEEDY classic 2 balance Part number 801 201 801 215 Drawing number 069 xxx Description SPEEDY classic 2 balance Check dimension 24 0 2 Lift clearance 1 3 mm Repeatability...

Страница 15: ...ing cycles increases 2 Lifting force 10 kN at release pressure 70 bar lifting force 15 kN at release pressure 80 bar 3 Set overpressure safety valve to max 5 bar above the max operating pressure 4 Onl...

Страница 16: ...rds auf das sich diese Erkl rung bezieht mit den folgenden Normen bereinstimmt 2006 42 EG Machines addendum II A Maschinen Anhang II A and the following standards were applied und dass die folgenden N...

Отзывы: