7 Start-up, operating and operation
7.1 On putting into operation for the first time
-
Visually inspect the entire machine and the fast closing clamp
-
Instruct unauthorised personnel to leave the machine
-
Check the fill levels of hydraulic oil.
-
Check the depth dimension A (see Chapter "8.1 Check
dimension
A
").
-
Check the fast closing clamp for hydraulic and pneumatic sealing.
7.2 Function check
-
When all clamping elements connected to the same circuit are fitted as described and tightened to
the appropriate tightening torque, connect the hydraulic pressure generator to the circuit.
-
Release: Slowly and carefully increase the hydraulic pressure to the release pressure. During this
process check the clamping elements for leaks. If a leak occurs, immediately switch off the pressure
generator and eliminate the leak.
7.3 Operating and operation
Only pressurise the fast closing clamp for the changing process.
Comment :
do not leave
the machine under continuous pressurise.
Adjust the release pressure of the fast closing clamp overpressure safety valve to max. 5 bar
above the maximum operating pressure. Adjust the operating pressure of the fast closing clamps
(see Chapter 9 "Specifications").
7.4 SPEEDY with blow-out function
-
First apply air pressure
-
After approx. 3 s release SPEEDY
-
Change pallet / clamp SPEEDY
-
Only now switch off air
Ensure an adequate air supply is provided.
Type:
Air flow rate l/min
SPEEDY classic 2 Twister
80