Note:  It is extremely important the 

unit centerline is continuous

and straight to ensure proper

installation.

1

 

If a continuous unit centerline does not exist from the 

original measuring process, it will be necessary to create one.   
Lightly mark a continuous unit centerline on the threshold.  
Next, mark a continuous unit centerline on each wall, starting 
where the threshold centerline meets the wall.  Use a level to 
ensure the wall centerline is plumb and straight.  The wall 
centerlines should be a minimum of the unit height from the 
threshold. 

Note

: Centerline (CL) is a term used to describe the center or 

mid-point of the unit. The position of the unit centerline can 
be located anywhere within the width of the threshold, as 
long as adequate structure exists beneath the centerline for 
fastening and the outer edges of the unit will not overhang 
the threshold.  The most common unit centerline position is 
the middle of the threshold.

QCI0150 REV. 0

Page 5 of 14 

Certified 06/04/10 

2

**IMPORTANT** 
Keep both holes in-line to ensure 
the header mounts level. 

3/16"

 U

nit H

eigh

t - 1/2”

              Use a level to check the threshold for out of level conditions if the original 
measured conditions are not available. If no conditions exist, measure up each wall 
centerline a distance of  

Unit Height - 1/2”

 from the threshold,  and clearly mark each location. 

 

Note:

 

 

Header Mount Hole = Unit Height - 1/2“ ,  or  Panel Glass 1 11/16”

If out of level conditions exist;  measure up the “high” side wall centerline a 
distance of “

Unit Height - 1/2”

  from the threshold and clearly mark this location. 

For the wall centerline distance on the “low” side of the threshold,  use a level to 
determine the threshold out of level distance and add that value to the equation 

Unit Height - 1/2”

.  Measure this summed distance up the “low” side wall centerline, 

from the threshold and clearly mark this location.  
Next drill a 7/16” diameter hole approximately 
3” deep, at each marked wall location. 
(See illustration example.)

 U

nit H

eigh

t - 1/2”

 (U

nit H

eigh

t - 1/2”) + 3/16”

THRESHOLD OUT OF 
LEVEL EXAMPLE.  FOR 
REFERENCE ONLY.

Содержание ROLAIRE

Страница 1: ...NEED INSTALLATION HELP Call 1 800 45 BASCO 452 2726 Monday Friday 8 00 A M 4 30 P M Eastern Time QCI0150 REV 0 Page 1 of 14 Certified 06 04 10 INSTALLATION INSTRUCTIONS 935 RODA FRAMELESS DOOR ROLAIRE...

Страница 2: ...RACKET 2 8 SC4640 CLAMP WITH ANTI JUMPER 1 9 SC4800 01 ROLLER ASSEMBLY WITH STOPPER PIN 1 10 SC4800 02 ROLLER ASSEMBLY 1 11 SC4610 GUIDE 1 12 SC4710 BOTTOM CATCH 1 13 SC4910 or SC4950 18 PULL KNOB or...

Страница 3: ...QCI0150 REV 0 Page 3 of 14 Certified 06 04 10 9 10 1 7 6 20 11 2 18 12 4 5 16 13 3 14 15 14 15 8 6...

Страница 4: ...ully break the glazed surface to prevent skidding when drilling Installation Notes To install your Basco Shower Enclosure you will need the following Pencil Low Tack Masking Tape Tape Measure 4 ft 6 f...

Страница 5: ...the threshold QCI0150 REV 0 Page 5 of 14 Certified 06 04 10 2 IMPORTANT Keep both holes in line to ensure the header mounts level 3 16 Unit Height 1 2 Use a level to check the threshold for out of lev...

Страница 6: ...and secure it with 8 x 1 1 2 truss head screws 18 Next drill three 3 16 diameter holes in the center of U channel 2 centerline groove provided for convenience two holes approximately 2 1 2 from each e...

Страница 7: ...e wall centerline marked in step one With a pencil carefully mark each hole position on the wall centerline Drill a 3 16 diameter hole approximately 1 deep directly on the wall centerline at the marke...

Страница 8: ...n tighten the 4 set screws on each Wall Mount Header Bracket Note The set screws closest to the wall must be tightened first Disassemble two Wall Mount Header Brackets 7 by loosening the set screws Ne...

Страница 9: ...ate side Use different sizes of setting blocks to make exposed edges of the glass level and plumb Exposed edges MUST be level and plumb before moving to next step Different sizes setting blocks may be...

Страница 10: ...small amount of silicone into each drilled hole and insert a wall plug into each hole Then carefully cut heads off of the wall plugs with a razor blade so there is nothing raised above the surface of...

Страница 11: ...YL WALL SIDE DOOR PANEL DOOR PANEL 15 Carefully hang the Door Panel with Rollers 9 10 on the Header 1 Make sure the Door Panel is lined up inside the Guide 11 Then if necessary adjust the Door Panel s...

Страница 12: ...Vinyl Seal to size equal to the Door Panel height minus 1 2 Place the Vinyl Seal onto the wall side of the door panel with vinyl lip facing inside the shower 2 For the Bumpers Place one bumper to the...

Страница 13: ...oor Panel 1 4 approx Location of the Bottom Catch when the Door Panel completely closed GUIDE SPRING DRIP VINYL DOOR PANEL STATIONARY PANEL Place 18 Pull Knob 13 or Back to Back Knob 13 on the Door Pa...

Страница 14: ...rs On the interior face of the Side Panel place a strip of low tack tape on the glass about 1 8 to 3 16 away from edge of the u channel both vertically and horizontally Run a small bead of silicone al...