![Rockwell Automation Allen-Bradley LDAT Series Скачать руководство пользователя страница 63](http://html1.mh-extra.com/html/rockwell-automation/allen-bradley-ldat-series/allen-bradley-ldat-series_installation-instructions-manual_1475648063.webp)
LDAT-Series Integrated Linear Thrusters
63
Rockwell Automation Publication LDAT-IN001B-EN-P - March 2020
5.
Align the first bearing puck to the first set of bearing mounting holes on the connector
side of the stator body.
6.
Loosely install the bearing puck screws.
7.
Slide another bearing puck on to the bearing rail.
8.
Align with set mounting holes next to the previous bearing puck.
9.
Loosely attach the bearing puck.
10.
Repeat step
7
…
until all the bearing pucks are installed.
11.
Torque the bearing puck screws to values shown.
12.
Torque the bearing rail screws to value shown in previous step.
13.
Attach the connectors to the stator body.
14.
Attach the end stop bracket to the slider assembly.
15.
Check the cable clearance in stator body.
Slide the slider assembly and verify the cables do not come in contact with it.
16.
Attach the stator end cap.
17.
If your linear thruster has the strip cover option, install the cover by following the
Remove Strip Cover procedure on page
in reverse.
Mounting
Screw Size
Torque
N•m (lb•in)
M3
1.1 (10)
M4
2.8 (25)
M5
4.5 (40)
M6
9.5 (84)
M8
24 (212)