– 5 –
I
N S TA L L AT I O N
C
O N S I D E R AT I O N S
This section focuses on some of the vehicle considerations for installing
your new OEQ
2
. Pre-planning your system layout and best wiring routes
will save installation time. When deciding how to lay out your new
system, be sure that each component will be easily accessible for making
adjustments.
Before beginning any installation, be sure to follow these simple rules:
1. Be sure to carefully read and understand the instructions before
attempting to install the OEQ
2
.
2. For safety, disconnect the negative lead from the battery prior to
beginning the installation.
3. For easier assembly, we suggest you run all wires prior to mounting
your OEQ
2
in place.
4. Route all of the RCA cables close together and away from any high
current wires.
5. Use high quality connectors for a reliable installation and to mini-
mize signal or power loss.
6. Think before you drill! Be careful not to cut or drill into gas tanks, fuel
lines, brake or hydraulic lines, vacuum lines or electrical wiring when
working on any vehicle.
7. Never run wires underneath the vehicle. Running the wires inside the
vehicle provides the best protection.
8. Avoid running wires over or through sharp edges. Use rubber or
plastic grommets to protect any wires routed through metal, espe-
cially the firewall.
9. ALWAYS protect the battery and electrical system from damage with
proper fusing. Install the appropriate fuseholder and fuse on the
+12V power wire within 18” (45.7 cm) of the battery terminal.
10. When grounding to the chassis of the vehicle, scrape all paint from
the metal to ensure a good, clean ground connection. Grounding
connections should be as short as possible and always be connected
to metal that is welded to the main body, or chassis, of the vehicle.
The following is a list of tools you will need for installing the OEQ
2
Red power wire
Wire strippers
Blue remote turn-on wire
Wire cutters
Black grounding wire
Voltmeter
Electric hand drill w/assorted bits
Jeweler's slotted screwdriver
Battery post wrench
Содержание OEQ2 HIGH
Страница 1: ... INSTALLATION OPERATION HIGH PERFORMANCE PARAMETRIC EQUALIZER ...
Страница 29: ...I N T E R N A T I O N A L I N F O R M A T I O N 26 ...
Страница 38: ...NOTES ...
Страница 39: ...NOTES ...