cobas c
111 Installation Manual
04906900001
INSTALLATION-MANUAL
cobas c
111
Version 3.0
Page 26 of 43
6.2
Instrument without ISE unit
6.2.1
Instrument placement & preparation:
1.
Place the instrument in a suitable position for operation (refer to location and
environmental conditions above).
2.
Unpack all accessory components like Water and Waste Reservoir, Reagent Disk,
Barcode Scanner, Printer paper, etc.
3.
Preposition all additional parts as appropriate power cord, cuvettes, reagents,
calibrators, etc.
4.
Insert a roll of printer paper as instructed in the Operator’s Manual. The printer
paper (thermal paper) is heat-sensitive and must be kept away from direct
sunlight and high temperatures.
5.
Mount the probe onto the Transfer Head.
6.
Place the Fluid Rack to the right side of the instrument. Place a new bottle of
cleaner, fill the Water Container with de-ionized water (CLSI Grade II) and check
that the Waste Container is empty.
7.
As next step Connect the Cleaner Protection pipe.
Notice:
Make sure the two internal Seals which are located in the interior of the black
protection pipe were mounted previously as shown on the picture above.
Attention: To avoid seals damaging, push pipe carefully to end position. Consider to
grease previously both seals, to assure an easier operation.
8.
Mount the Fluid Water and Waste tubing sets to the respective lids.
9.
Connect the tubing connectors to their respective counterparts at the Fluid
connector terminal at the right side of the instrument.
10.
Place the lids on top of their bottles. White -> water; yellow -> waste; red ->
cleaner.
11.
Plug the cable of the barcode scanner into the COM2 port. (This is the port
named with Scanner)
12.
Connect the cross wired LAN cable to the RJ45 connectors (named DM and IC)