4.5 System piping 
The diameters of the system piping must be chosen in order to obtain an average gas speed from 15 a 30 
m/s  and  must  never  be  smaller  than  the  diameters  of  the  blower  openings,  if 
the diameters are different, use a taper connector. 
The system piping should be properly aligned and supported to prevent stress 
on the blower openings 
Connect the cooling ports to atmosphere by means of silenced pipings. 

Warning:protect  consistently  the  cooling  port  from  the  risk  of 
cutting and trapping. 

Provide flexible joints and support the pipes near the nozzles. 
Isolate  the  pipes  to  avoid  heating  the  environment  as  well  as  a  precaution  to 
accidental contact 
The pipes must be thoroughly cleaned before connection, in case of vacuum operation install a dirt filter for 
the first 100 working hours and provide a vacuometer to check the dirt filter. 
The gaskets must not interfere with the gas system. 

Warning : Remove the protective covers from the blower openings just before connection. 

Warning: The surface of the delivery pipes can exceed 70 °C. 

The recommended accessories are the following 

4.5.1 Vacuum operation 

This is the standard operation of the blower, the relief valve RVV is optional because the blower can operate 
with suction nozzle closed 

Pos.  Description 
SA 

Inlet silencer 

SM 

Discharge silencer 

SJ 

Injection silencer 

RVV  Relief valve 
WR 

Check valve 

4.5.2 Pressure operation 

In this case insert a check valve WRi in the injection pipe in order to prevent the back flow of outlet gas. 
The operation in this condition must respect the performance limits of the corresponding blower RBS (see the 
S12--- manual) 

Pos. 

Description 

Filter 

WR 

Check valve 

RVP 

Relief valve 

SPF 

Inlet silencer 

SM 

Discharge silencer 

SJ 

Injection silencer 

WRJ 

Injection check valve 

4.5.3 Pressure / Vacuum operation 

With this kind of blower is not possible the Pressure / Vacuum operation 

WR

SA

SM

RVV

SJ

SJ

RVP

SM

SA

F

WR

WRJ

www.fraserwoods.ca

Содержание RB-DV 65/V

Страница 1: ...ating and maintenance instructions for blowers Instruction for Transport Installation Operation Maintenance PD Blower Vacuum Pump Service Repair Facility 120 10293 276 ST Acheson Alberta Canada T7X 6A...

Страница 2: ...e safety of the plant to carry out the necessary work on the blower and who can recognize and avoid any possible dangers Acknowledge of first aid is also required as is information about local rescue...

Страница 3: ...itable clothing avoid large clothes neckties bracelets or necklaces Do not use the blower in operating conditions different from the ones rated in the order confirmation Do not touch components under...

Страница 4: ...for 12 months of operation and in any case for a maximum of 18 months after the delivery The warranty apply only if the contractual and administrative norms have been observed and if the installation...

Страница 5: ...1 Vacuum operation 29 4 5 2 Pressure operation 29 4 5 3 Pressure Vacuum operation 29 4 6 Cooling circuit only for RV 30 4 7 Electric connection 30 5 OPERATION 31 5 1 Preliminary controls 31 5 2 First...

Страница 6: ...and 5B in which the seals 45 and bearings 31 32 and 33 are located The rotors 2 are synchronized by means of a gear with involute toothed wheels 11A and 11B The shafts have labyrinth seals gas leaks a...

Страница 7: ...50 500 150 1000 50 25 150 130 50 25 145 2000 350 500 150 1000 50 25 150 130 50 25 To Atmospheric temperature 20 C To 45 C Installation altitude 1000 masl if not differently specified on page 5 Po Atmo...

Страница 8: ...e Overheating Fire Blower stall and ejection of parts Use a safety temperature switch when the blower sucks from a closed circuit Operation with temperature T2 T1 higher than the maximum one Blower st...

Страница 9: ...erature from 20 C to 40 C Relative humidity from 10 to 80 If different climatic conditions are forecast contact ROBUSCHI Do not remove the nozzle protections and renew the preservation every 6 month o...

Страница 10: ...axis and vice versa exchange the oil levels by changing the position of the plugs in accordance with Fig 4 on both blower sumps Pos Description Ps Left foot Pd Right foot Tc Oil fill plug Ts Oil drai...

Страница 11: ...er Check the alignment by using comparators or gauges with scales as shown in Fig 6 Coupling diameter Distance S mm Axial deviation Ka mm Standard deviation Radial Kr mm Angular Kw mm 80 3 1 0 13 0 13...

Страница 12: ...0 200 125 118 125 132 140 150 160 180 200 225 145 125 132 140 150 160 180 200 225 250 Mount the drive belts Produce belt tension by using the motor thrust screws in accordance with the values shown in...

Страница 13: ...ts must not interfere with the gas system Warning Remove the protective covers from the blower openings just before connection Warning The surface of the delivery pipes can exceed 70 C The recommended...

Страница 14: ...omplying with the law in force Check on the motor plate Voltage Absorbed current Frequency number of phases Check the wiring diagram in the terminal board of the motor if the diagram has not been supp...

Страница 15: ...d value is reached During the first 8 hours of operation check that there are no oil leakage no cooling liquid leakage only RV and strange noises or vibrations if such problems are found stop the blow...

Страница 16: ...3 10 1 80 4 90 145 10 50 6 00 16 50 6 00 3 50 9 50 Warning Dispose the used oil in accordance with local regulations 6 1 1 Oil type and viscosity Mineral oil for general use mineral oil for hydrostat...

Страница 17: ...fication of parts see the sections at pages 37 and 38 Empty the lubricating oil out of the sump 12B Warning Dispose the used oil in accordance with local regulations Disassemble the gear sump 12B Meas...

Страница 18: ...always Type serial number and year of construction of the blower these elements are indicated in front page of this manual and relevant position of spare part indicated in the table Warning Do not use...

Страница 19: ...of the rotors and of the gear 6 4 6 5 6 Scale deposits in the compression chamber Clean the compression chamber and the rotors balance the rotors if necessary 6 3 7 Intake of foreign particles Remove...

Страница 20: ...umps 12A e 12B Warning Dispose the used oil in accordance with local regulations 8 1 2 Disassembly of drive side sump Remove the key 30 Lock the cover 5A to the casing with at least 4 clamps Loose the...

Отзывы: