![Robus BIOPEL Скачать руководство пользователя страница 3](http://html1.mh-extra.com/html/robus/biopel/biopel_installation-manual_1471579003.webp)
Comments on the manual
Never handle the auger, blower, nor crawl in the hopper when the system is powered.
There will be no warning prior to the activation of these components. The boiler must
not be operated without the shield on the burner.
The system is provided with an electrical current of 230V/50Hz. An improper installation
or improper repair can caus e life-threatening electrical shock. Electrical connections
must be performed by the person who has the right skills and training. Performance of
electrical installation must be carried out in COMPLIANCE with the relevant rules. Always
disconnect the system from the electrical supply prior to starting maintenance work or
servicing. The system must be connected to a separate electrical circuit, which is
equipped with the proper circuit breaker and earth leakage breaker.
The boiler must be mounted to a functioning chimney. In the event that you smell smoke
or see any other indication of improper draft of the chimney, all operation of your
system must cease immediately and must remain so until a solution to the draft problem
has been resolved. Continuing operation may result in death or injury.
Always read the manual before system installation or repair. If in doubt, seek
professional help.
Open top covers etc. with extreme caution. When the boiler is in operation, there is a
risk of high temperature surrounding the top covers, which can result in injury. Avoid
handling the boiler while it is in operation. Never open the ash tray while the boiler is in
operation. The system may be operated by skilled people. If you are in doubt as to the
safe operational use of the boiler, contact your dealer.
The menu structure etc. for the controller is supported by the help texts found in the
control box itself. Due to constant updates and new features, the menu structure of the
controller will not be described here in this manual. Instead, it is recommended to
browse the controller thoroughly prior to use and to receive an overview of all functions,
etc. by your installer.
This manual must be kept with the boiler!
Содержание BIOPEL
Страница 1: ...Biopel Pellet Boiler Installation manual...
Страница 4: ......
Страница 12: ......
Страница 23: ......