Robus BIOPEL Скачать руководство пользователя страница 2

Dear Customer.

Thank you for choosing Robus Biopel pellet boiler system. This product is designed and
manufactured to the highest standards in the EU. In order for you to get the most out of your
product, we strongly recommend that you carefully read this manual prior to installation and
operation. In the event that you encounter any difficulties during installation or operation, we
recommend that you first refer to this manual or contact Robus Energy Ltd for further
assistance.

Note:

Help text on all menu items is displayed in the controller and is therefore not described

here in this manual. It is recommended to study the menus prior to initial start.

Save this manual, so you always have it available when needed. 

Page 3: Comments on the Manual 
Page 4: The Clean Air Act 1993 and Smoke Control Areas
Page 4: Fuel requirements
Page 5: Boiler Specifications 
Page 6-8: General installation guidelines
Page 9-10: Hydraulic installation of the Boiler 
Page 11: Pellet Hopper 
Page 12: Vacuum Transport 
Page 13: Wiring Diagram 
Page 14: Electrical Connection Scheme 
Page 15: Optional Equipment 
Page 16-17: Internet Connection 
Page 18: Cloud Service 
Page 19: First Time Start-up 
Page 20: Cleaning the Burner/Boiler 
Page 21: Service and Maintenance 
Page 22-23: Troubleshooting 
Page 24: Condensation of Flue Gas 
Page 25: Warranty 
Page 26: CE Declaration of Conformity

Содержание BIOPEL

Страница 1: ...Biopel Pellet Boiler Installation manual...

Страница 2: ...ibed here in this manual It is recommended to study the menus prior to initial start Save this manual so you always have it available when needed Page 3 Comments on the Manual Page 4 The Clean Air Act...

Страница 3: ...indication of improper draft of the chimney all operation of your system mustceaseimmediately and mustremain so until a solution to thedraftproblem has been resolved Continuing operation may result i...

Страница 4: ......

Страница 5: ...se countries Separate legislation the Clean Air Northern Ireland Order 1981 applies in Northern Ireland Therefore it is a requirement that fuels burnt or obtained for use in smoke control areas have b...

Страница 6: ...uts as the seal between the boiler and the burner can leak over time 4 Make sure that the burner is horizontal and that all connections are tight Burner description The main parts of the burner are th...

Страница 7: ...ler for burner installation However the opposite flange on the boiler bust be always sealed For example if you choose left flange for burner connection make sure that right flange is properly sealed B...

Страница 8: ...le located on the top of the burner and secure with 2 x burner pipe screws Attach PVC tube on the burner pipe and from the other side on the external auger outlet You can cut the PVC tube if necessary...

Страница 9: ...nt ignition of the boiler and will prolong the life of the igniter The min buffer thermal store capacity should be 10 litres kW output eg 200 litres for Biopel 20 The load valve supplied with the boil...

Страница 10: ...and connection board are pre wired with simple plugs to allow for quick installation When using the Compact type hopper the connection board can be fixed to the sloping wall of the hopper near the bur...

Страница 11: ...is the boiler pump ROOM REGULATOR Room thermostat volt free Other connections for optional accessories are DHW PUMP Used to control a pump or 2 port valve for hot water production KOMPRESSOR Connecti...

Страница 12: ......

Страница 13: ...t is designed to offer the home owner and installer a series of simple menus to give full control of all boiler settings and parameters The controller has 3 levels of PIN protection in order to preven...

Страница 14: ...t the same time o Summer mode sets the burner power to an half value To be specific Feed time max and Feed interval min is reduced to half Cleaning cleaning of the grate during PID modulation work o A...

Страница 15: ...rection correction of fan speed 50 Power factor correction of burner power Changes values in Feeder time max and Feeder interval min in range of 50 Example if you set 30 in Auger correction 30 it mean...

Страница 16: ...at the size in Kw is correct 5 Burner size changes values in Service settings shown below 6 Auger setup Ignition a Feed time for how long pellet auger supplies pellets on the burner grate b Fan speed...

Страница 17: ...d increase fan speed or pellet quantity High pellets Flame is to long If you open top doors flame goes out of the boiler Often red color and black ends Then you should decrease fan speed or pellet qua...

Страница 18: ...for PID regulation is lower which means speed of the fan is decreased in all PID modulation range Power correction Power correction is responsible for changing number of pellets going on the grate You...

Страница 19: ...removing the ash from the chimney flue Never dispose of hot ashes in the trash but let it cool in a metal bucket Hot ashes can re ignite Burner head Remove any ash or cinders from the grate Remove an...

Страница 20: ...perform service Please note that service indicators are only expectations based on experience Components can easily have a longer lifetime than suggested by the service indicator It is recommended to...

Страница 21: ...e correct positioning Burnergrate rests on support ledge Burnergrate upstand at this end Burnergrate correctlypositioned Burnergrate upstand locked in burner Burner grate incorrect positioning Burner...

Страница 22: ...n receipt If the buyer declares that the delivery was inadequate or defective the customer must immediately and without delay make a written claim with Robus Energy Returns are only made by agreement...

Страница 23: ......

Отзывы: