Page 27
4.2
Gas Supply
The whole of the gas installation including the meter should be inspected, tested for soundness and
purged in accordance with local regulations.
It will be necessary to ensure that the air is fully purged from the heater inlet pipe up to the main gas
valve inlet test nipple before the start gas burner will ignite.
4.3
Mechanical checks
1. Check that the fan(s) are free to run and delivery louvres are turned to give required air deflection.
2. Check that the flue is installed in accordance with these instructions and local regulations.
3. Check that the Settings of the Combination Fan/Limit thermostat are correct - see below.
Note: The limit thermostat is preset and sealed at the works and will need no adjustment.
To set the combination fan/limit thermostat first remove the cover by releasing the cover fixing screw
and pulling off the cover. The three hands from left to right should be set approximately as follows
subject to site conditions:- See Fig. 2.2.
Always refit the cover and tighten the cover screw after adjustments.
4.4
Automatic Ignition Unit Heaters
4.4.1
Carry Out a “Dry Run”
To ensure that all the controls are in safe working order it is advisable to operate the fully automatic
controls for the first time with no main gas.
To do this unplug the electrical plug from the main gas valves (there are two plugs for Nova automatic
valves). Now, using the installed external control turn on the burner.
The automatic sequence will now begin as described in Section 2. The electric ignition will be heard
and the spark may be observed via the gas inlet port in the rear panel.
The start gas flame will then ignite on the opening of the start gas valve. If the flame does not ignite
then the control will go to the “lockout” condition. Wait one minute, then press in the control box reset
button, or the remote reset button if fitted and repeat until the start gas flame ignites.
Note: At the first firing of the heater it may be necessary to repeat several times whilst purging the
remaining air from the gas train. There is no adjustment for the start gas burner.
Once the start gas flame has ignited it will be monitored by the flame probe and should remain on
until the controls turn it off.
Turn off the burner at the external control and refit the electrical plug/s to the main gas valve.
HAND 1 FAN OFF
SET TO 38°C
HAND 2 FAN ON
SET TO 57°C
HAND 3 LIMIT
SET TO 95°C
Combination Thermostat
Содержание Dualair DA260G Series
Страница 2: ...Details of condense drain for cooling coil ...
Страница 8: ...Page 6 Fig 2 1 DualAir 300 Module Dimensions Section 2 Technical Data FRONT VIEW REAR VIEW SIDE VIEW ...
Страница 9: ...Page 7 Fig 2 2 DualAir 380 Module Dimensions FRONT VIEW REAR VIEW SIDE VIEW ...
Страница 33: ...Page 31 Fig 5 1 Wiring for DualAir Units On Off Burner 230v Controls Section 5 Wiring Diagrams ...
Страница 34: ...Page 32 Fig 5 2 Wiring for DualAir Units On Off Burner 24v Controls ...
Страница 35: ...Page 33 Fig 5 3 Wiring for DualAir Units Hi Low Burner 230v Controls ...
Страница 36: ...Page 34 Fig 5 4 Wiring for DualAir Units Hi Low Burner 24v Controls ...
Страница 37: ...Page 35 Fig 5 6 Wiring for DualAir Units BMS Burner Modulation 230v Controls ...
Страница 38: ...Page 36 Fig 5 7 Wiring for DualAir Units BMS Burner Modulation 24v Controls ...
Страница 39: ...Page 37 Fig 5 7 Wiring for DualAir Units Full Burner Modulation 230v Controls ...
Страница 40: ...Page 38 Fig 5 8 Wiring for DualAir Units Full Burner Modulation 24v Controls ...
Страница 41: ......
Страница 42: ......
Страница 43: ......
Страница 44: ......
Страница 45: ......
Страница 46: ......
Страница 47: ......
Страница 48: ......
Страница 49: ......
Страница 50: ......