Riverside Hydronics 1500 WB 250A-IF Скачать руководство пользователя страница 24

24 

34-55   08/14

 

  In hybrid systems, prioritizes and rotates through up to 12 condensing boilers before energizing and rotating 

through up to 8 non-condensing boilers. 

  Communicates with boilers by Modbus RTU protocol over 485 serial connection (2-wire, shielded daisy chain). 

  Connects to Building Automation Systems through either a 4-20mA analog signal for remote set point or over 

the non-proprietary Modbus TCP/IP network protocol. Gateways are available for other protocols. 

  Includes two equipment activation and proving terminals for system pumps and combustion air.

 

10.7  BAS Protocol Gateways 

When communicating over a network connection, the standard protocol of the TempTrac control is Modbus RTU. 
The standard protocol between the OnTrac and the BAS is Modbus TCP/IP. A gateway will be required to 
communicate with the BAS if it uses a different protocol. Riverside Hydronics offers pre-mapped gateways that 
support BACnet MSTP, BACnet IP, Lonworks or Johnson Controls N2. Consult factory for other protocols.

 (For a 

general overview of the application of this gateway, refer to Setup Manual #34-525.)

 

 

These third-party supplied gateways are custom-programmed components that must be sourced through Riverside 

Hydronics. 

 
 

11 

SEQUENCE OF OPERATION 

1.  Incoming 120VAC  

a. 

Full time power to the Main Control Switch 

b. 

Full time power to the Variable Frequency Drive 

2. Power On 

-

 

When the main control switch is turned on: 

a. 

120v is applied to the step-down transformer (24v) 

b. 

120v is applied to the L.W.C.O. terminal L1 

c. 

120v is applied to the Fenwal Flame Safeguard Control 

d. 

24v is applied to the TempTrac operating temperature control terminal L1 

3. Call For Heat - 

If the TempTrac operating control senses a call-for-heat condition: 

a.  The High Gas Pressure and low Gas Pressure Switch (both optional) are energized and their safe condition 

is proved. 

b.  The thermostat contact on the Fenwal Flame Safeguard Control is energized. 

c.  The flame control will then verify the Airflow-Proving Switch is in the open position, which must exist before 

the blower is powered. 

d.  Energizing the blower should close the airflow proving switch. If the airflow-proving switch is not in the 

closed position, the flame control’s fan terminals F1-F2 will power the Variable Frequency Drive (VFD) 
blower system at low speed for pre-purge. 

e.  If the airflow-proving switch does not close following the blower being energized, the flame control will 

lockout. 

4. Proof of Air Pressure Switch 

- The control will look for a signal from the airflow-proving switch, indicating that 

the blower is operating: 

a. 

When the airflow generated by the blower is sufficient to cause the differential air switch to close, the 15 -
second pre-purge delay will start. 

b. 

During this period any flue products or combustible gases which may have settled in the boiler are 
evacuated. 

5. Heat-Up

 - Following the pre-purge delay, the hot surface igniter will be energized: 

a. 

The flame control will monitor the current applied to the hot surface igniter. 

b. 

If the flame control determines the proving current meets the threshold, a dwell time delay starts to assure 
the hot surface igniter has sufficient time to reach ignition temperature. 

6. Ignition

 - When dwell time is completed a 4-second Trial for Ignition (TFI) period is initiated: 

Содержание 1500 WB 250A-IF

Страница 1: ...LOW THE INFORMATION IN THIS MANUAL AND ALL OTHER PROVIDED INSTRUCTIONS LABELS AND MARKINGS BEFORE INSTALLING OPERATING OR SERVICING THIS UNIT TO THE INSTALLER After installation these instructions mus...

Страница 2: ...ection 5 6 Gas Train and Controls Certification 5 7 Gas Control Trains 6 Combustion and Ventilation Air 6 1 Equipment Located In Confined Spaces 6 2 Maximum Allowed Remote Combustion Air Inlet Length...

Страница 3: ...mpTrac 10 4 Boiler Management System BMS Remote Connections 10 5 Outdoor Reset 10 6 OnTrac Boiler Management System BMS 10 7 BAS Protocol Gateway 11 Sequence of Operation 12 Initial Startup 12 1 Initi...

Страница 4: ...ut the main gas supply valve to the appliance from a location safely away from the emergency Failure to follow these instructions can cause property damage personal injury and exposure to hazardous ma...

Страница 5: ...5 34 55 08 14 2 PRODUCT DESCRIPTION Component Controls and Connection Locations Locations May Vary...

Страница 6: ...be enclosed in approved conduit or approved metal clad cable To avoid serious damage DO NOT energize the unit until the system and appliance is full of water 3 4 Location These units are suitable for...

Страница 7: ...ow pumping systems on the boiler loop motorized isolation valves may be recommended Building flow may have to be limited to only the firing boilers during periods of low building heat demand to preven...

Страница 8: ...xchanger can cause a non warrantable failure 3 Make sure there are no system leaks DO NOT use petroleum based stop leak products All system leaks must be repaired The constant addition of make up wate...

Страница 9: ...aight Pipe to add the equivalent straight pipe for each elbow or tee to obtain the total distance from the meter Use this corrected total distance from the meter for determining the suggested pipe siz...

Страница 10: ...off device 6 A sediment trap drip leg MUST be provided in the inlet of the gas connection to the unit 7 The code compliant vent limiters are designed and must respond to pressure changes in the instal...

Страница 11: ...tion Codes or applicable provisions of the local building codes NOTE This unit may be installed with a remote air intake system which uses a make up air duct to draw combustion air directly from outdo...

Страница 12: ...remote combustion air vent termination to adequately protect the combustion air inlet from wind and weather A UL Listed air intake termination cap is available from Riverside Hydronics and may have s...

Страница 13: ...om the appliance vent connection to the vertical vent or stack that terminates outside and above the building roof must be made with listed Type B double wall or equivalent must be as direct as possib...

Страница 14: ...manufacturer of the listed Category III or IV venting system being installed Attach this adapter to the VT3 vent connection outlet following the instruction provided by the adapter s manufacturer Foll...

Страница 15: ...e cfm Max Vent Press W C 399 136 0 5 500 170 0 6 650 221 0 8 750 255 1 0 850 289 1 2 900 306 1 2 1000 340 1 3 7 3 2 Vertical or Horizontal Vent Termination 1 The vent terminal must have a minimum clea...

Страница 16: ...personal injury exposure to hazardous materials or death Conventional Venting Through the Wall Venting Combining Vents with a Draft Inducer 8 OPERATING AND SAFETY CONTROLS 8 1 Operating Temperature C...

Страница 17: ...expansion Contact a boiler or plumbing professional to resolve this situation Do not plug the relief valve 8 4 Electronic Low Water Cut Off Low Water Cut Off Operation When the water level is above th...

Страница 18: ...g Probe 1 This is used to regulate the temperature of the boiler 9 4 Control Buttons SET Displays and modifies the temperature set points In programming mode it selects a parameter or confirms an oper...

Страница 19: ...will hold at low fire until parameter St4 is reached causing burner to modulate higher or parameter St1 is reached causing the burner to shutoff St4 The Modulation Threshold This additional differenti...

Страница 20: ...int Push the SET key The upper display will show the St1 parameter name while the lower display will show its value Use the UP or DOWN key to cycle through the parameter names Push the SET key to modi...

Страница 21: ...ted or is reading correctly Outdoor reset disabled Warm weather shutdown disabled Check wiring and sensor Terminals 16 17 HA High temperature limit setpoint exceeded Buzzer sounds operation continues...

Страница 22: ...daisy chain arrangement 10 4 Making BMS BAS remote connections for analog and binary on off signals A terminal strip for the remote connection is located behind the hinged control panel at the top of...

Страница 23: ...adjusted upward by the amount of the rr1 value See Outdoor Reset Manual 34 400 6 for full description Factory Default Settings The values of the Outdoor Reset and Warm Weather Shutdown functions in th...

Страница 24: ...he Fenwal Flame Safeguard Control d 24v is applied to the TempTrac operating temperature control terminal L1 3 Call For Heat If the TempTrac operating control senses a call for heat condition a The Hi...

Страница 25: ...lay On Low Fire Hold Relay has timed out it energizes the Modulation Release Relay SPDT to enable the analog signal from the TempTrac to the VFD to regulate the speed of the blower a The TempTrac will...

Страница 26: ...Tools 12 2 Resources Product Installation Maintenance Manuals Start up Report with instructions Local State Federal Codes Toll Free 24 Hour Technical Support 1 800 433 5654 12 3 On Site Consideration...

Страница 27: ...ng the rocker switch on the front of the control enclosure assembly When the burner fails to light the flame control will lockout Start the burner in Low Fire Burner combustion must be optimized at bo...

Страница 28: ...in the flue vent approximately two feet from the appliance See Gas Train Illustration below for details With the burner firing and adjusted to low fire adjust the regulator screw clockwise to increas...

Страница 29: ...LATOR VALVE ORIFICE ADJUSTMENT Gas Train Illustration for Centauri Models 250 through 500 REGULATOR ADJUSTMENT HIGH GAS PRESSURE SWITCH DUAL SAFETY SHUTOFF VALVE LOW PRESSURE GAS SWITCH MANIFOLD PRESS...

Страница 30: ...for proper blower pressure setting adjust if required Air switch may be defective Blocked Filter Switch Check for 24V at the N C side of the blocked filter switch Replace filter or switch as required...

Страница 31: ...31 34 55 08 14 14 REPLACEMENT PARTS REPLACEMENT PARTS...

Страница 32: ...32 34 55 08 14 14 1 Control Panel...

Страница 33: ...316SS 1 EA 8 102163 PROBE THERMOSTAT DIXELL 18NB NTC 25FT NICKEL BRASS 1 EA 9 104195 PROBE THERMOSTAT DIXELL 18NB NTC 5FT NICKEL BRASS 1 EA 10 116458 RELAY SPST 30A 24V OMRON G7L 1A TUB J CB AC24 N O...

Страница 34: ...34 34 55 08 14 14 3 Burner Assembly...

Страница 35: ...163 ELL BLACK 90DEG 1 16 2 5973 NIPPLE BLACK 1 4 X 2 17 1 101216 SWITCH PRESSURE HGP G ANTUNES 8101111202 2 20 W 18 1 101201 SWITCH PRESSURE LGP G ANTUNES 8103116202 1 20 W 19 1 SEE BOM NIPPLE BLACK 1...

Страница 36: ...n or installer should use the procedures described in item 5 6 below 3 Any sign of soot on the heat exchanger or in the flue indicates the need for a combustion inspection Properly installed and adjus...

Страница 37: ...combustion and ventilation air is unobstructed to the appliance 10 When electrical controls are serviced or replaced refer to ELECTRICAL COMPONENT LOCATIONS for identification and location of compone...

Страница 38: ...detection system components c Check firing rate control d Check piping and wiring of all interlocks and shutoff valves e Inspect burner components f Check igniter g Test high and low gas pressure inte...

Страница 39: ...39 34 55 08 14 NOTES...

Страница 40: ...40 34 55 08 14 MODEL NUMBER SERIAL NUMBER INSTALLATION DATE Riverside Hydronics LLC 990 Haltom Road Ft Worth TX 76117 1 800 990 5918 www riversidehydronics com...

Отзывы: