PARTS LOCATION 

Top Plate Back 

Side Wall Sheets 

Barge Flashing 

Spouting 

Roof Sheets  

Top Plate Side 

Top Plate Front 

Bottom Plate Front 

Bottom Plate Side 

Back Wall Sheets 

Front Wall Sheet 

Door Jambs 

Front Wall Sheet 

Door Side Flashing 

Hinge 

Door Brace 

Door Top/Bottom  

Ridge Beam 

Jack Stud 

Ridge Flashing 

ASSEMBLE FRONT 

PANEL 

ASSEMBLE WALLS 

ASSEMBLE ROOF 

SECURE SHED 

ASSEMBLE BACK 

PANEL 

ASSEMBLE SIDE 

PANELS 

LAY FOUNDATION 

ASSEMBLE DOOR 

Door Sheets 

Padbolt Support  

QUICK OVERVIEW 

Содержание Duratuf SENTRY SHEDS SG2020

Страница 1: ...ASSEMBLY INSTRUCTIONS SG2020 BASE SIZE 2 020m x 2 020m...

Страница 2: ......

Страница 3: ...EQUIREMENTS Following are the minimum requirements for cladding used in Sentry Sheds Wash all surfaces annually using a hose and soft nylon brush Within 2 km of coast wash every 3 months as above Afte...

Страница 4: ...r Jamb 1 850 m 2 Roof 2 200 m 4 Door Brace 1 160 m 2 Door 3 4 Sheet 1 810 m 2 Ridge Flashing 2 055 m 1 TIMBER Barge 1 100 m 4 Bottom Plates H4 Green Front Back 2 020 m 2 Padbolt Support 0 140 m 1 Bott...

Страница 5: ...Side Back Wall Sheets Front Wall Sheet Door Jambs Front Wall Sheet Door Side Flashing Hinge Door Brace Door Top Bottom Ridge Beam Jack Stud Ridge Flashing 5 ASSEMBLE FRONT PANEL 6 ASSEMBLE WALLS 7 AS...

Страница 6: ...g through from underneath During construction you may raise the bottom timber plate to allow the wall cladding to protrude 20mm below the bottom plate This will stop water flowing between the bottom p...

Страница 7: ...flashings and assemble door as shown Drill and rivet as per diagram STEP 4 On the back of the door place door braces in posi tion as shown in fig 3 Ensure that the top and bottom ends of the braces ar...

Страница 8: ...s to the Top Plate at each end making sure that the top corners of the sheets are flush with the top of the Top Plate and that the sides of the wall sheet overhang the Top Plate by approx 15mm as show...

Страница 9: ...e using two clouts per pan STEP 4 Nail the wall sheets to the Bottom Plate at each end ensuring that each side of the wall sheets overhangs the Bottom Plate by 15mm and that the distance between the T...

Страница 10: ...nges to the Door Jamb Flashing ensuring door closes properly Fit remaining rivets STEP 3 Place 2 x Wall Sheets on timber Ensure that the top of the sheets are flush with the top of the Top Plate and t...

Страница 11: ...2 per join screw the Top and Bottom Plates together in the corners STEP 2 Repeat Step 1 with the second Side Panel ensuring that the Side Panel overlaps the Back Wall Panel STEP 3 Stand up the Front...

Страница 12: ...ce and use 2 x 75mm screws to secure the Jack Studs to the underside of the Ridge Beam one at each end fig 1 Turn the Ridge Beam Jack Stud assembly over and place it on the timber Top Plate in a centr...

Страница 13: ...eet then using 1 x 40mm Weatherseal nail fix Roof Sheet through the pan into the Top Plate Repeat at the front ROOF ASSEMBLY CONT 12 STEP 4 Centralise the Roof at the right hand end with the Ridge Bea...

Страница 14: ...Plate and the concrete slab A 10mm masonry drill bit is required OPTIONAL SENTRY FLOOR Position the Floor Joists centrally between the side Base Plates and skew nail each end with two 75mm nails Chec...

Страница 15: ......

Страница 16: ...less than 200g m2 as published by Branz Warranty certificate being returned to manufacturer within 21 days of purchase together with proof of purchase This warranty does not cover the following Fasten...