background image

 

 

ASSEMBLE FRONT PANEL 

15mm 

15mm 

15mm 

15mm 

BOTTOM PLATE 

1811mm 

1811mm 

TOP PLATE 

530mm 

960mm 

TOP PLATE 

DOOR OPENING 

Plan View 

TOP 

PLATE 

DOOR 

JAMB 

NAIL 

x3 

x3 

x3 

SELECT: 
 
2 x 1.850 Wall Sheets 
1 x 2.020 Top Plate (Red) 
1 x 2.020 Bottom Plate (Green) 
2 x 1.850 Door Jamb Flashings 
28 x 30mm Galv Clouts 
17 x Rivets 

STEP 1: 

 



Lay out 1 x Top Plate and 1 x Bottom Plate on a flat 
surface as shown  

STEP 2: 

 



Using 2 x 30mm clouts, nail the Door Jamb Flashing flush with 
the top of the Top Plate at the correct  measurement as shown 
in plan view. Pre drill holes using a 3.5mm drill bit 

 



Check the distance between the top and bottom plates then use 
a further 2 x 30mm clouts to nail the Door Jamb Flashings to 
the bottom Plate. Pre drill holes. 

STEP 4: 

 



Place the door on the panel (In open position, approx 
20mm below top of top plate). Using two rivets, rivet the top 
and bottom hinges to the Door Jamb Flashing, ensuring 
door closes properly.  

 



Fit remaining rivets. 

STEP 3: 

 



Place 2 x Wall Sheets on timber. 

 



Ensure that the top of the sheets are flush with the top of the 
Top Plate and that the sides of the wall sheets overhang the 
Top Plate by 15mm as shown. Nail wall sheets to Top Plate 
(two clouts per pan) 

 



Nail the wall sheets to the Bottom Plate making sure that the 
Plates are the correct distance apart and that the sides of the 
wall sheets overhang the Bottom Plate by 15mm

 



Drill & rivet Door Jamb Flashings to wall sheets using four 
rivets equally spaced on each side. 

NOTE: 

The Doorway is standard at 530mm from left-hand end. 

To shift the doorway to the right-hand side of the front 
wall, simply measure 530mm from the right-hand end.

 

NOTE: 

Door can be hinged on either side. 

IMPORTANT—IF YOU CHOOSE TO RAISE YOUR TIMBER 
BASE PLATE –READ THE FOLLOWING; 

 

For sheds with Raised Base Plate option only (see page 5), deduct 
30mm from measurement shown between Top and Bottom Plates on 
all wall panels, so cladding protrudes 20mm below bottom plate

Содержание Duratuf SENTRY SHEDS SG2020

Страница 1: ...ASSEMBLY INSTRUCTIONS SG2020 BASE SIZE 2 020m x 2 020m...

Страница 2: ......

Страница 3: ...EQUIREMENTS Following are the minimum requirements for cladding used in Sentry Sheds Wash all surfaces annually using a hose and soft nylon brush Within 2 km of coast wash every 3 months as above Afte...

Страница 4: ...r Jamb 1 850 m 2 Roof 2 200 m 4 Door Brace 1 160 m 2 Door 3 4 Sheet 1 810 m 2 Ridge Flashing 2 055 m 1 TIMBER Barge 1 100 m 4 Bottom Plates H4 Green Front Back 2 020 m 2 Padbolt Support 0 140 m 1 Bott...

Страница 5: ...Side Back Wall Sheets Front Wall Sheet Door Jambs Front Wall Sheet Door Side Flashing Hinge Door Brace Door Top Bottom Ridge Beam Jack Stud Ridge Flashing 5 ASSEMBLE FRONT PANEL 6 ASSEMBLE WALLS 7 AS...

Страница 6: ...g through from underneath During construction you may raise the bottom timber plate to allow the wall cladding to protrude 20mm below the bottom plate This will stop water flowing between the bottom p...

Страница 7: ...flashings and assemble door as shown Drill and rivet as per diagram STEP 4 On the back of the door place door braces in posi tion as shown in fig 3 Ensure that the top and bottom ends of the braces ar...

Страница 8: ...s to the Top Plate at each end making sure that the top corners of the sheets are flush with the top of the Top Plate and that the sides of the wall sheet overhang the Top Plate by approx 15mm as show...

Страница 9: ...e using two clouts per pan STEP 4 Nail the wall sheets to the Bottom Plate at each end ensuring that each side of the wall sheets overhangs the Bottom Plate by 15mm and that the distance between the T...

Страница 10: ...nges to the Door Jamb Flashing ensuring door closes properly Fit remaining rivets STEP 3 Place 2 x Wall Sheets on timber Ensure that the top of the sheets are flush with the top of the Top Plate and t...

Страница 11: ...2 per join screw the Top and Bottom Plates together in the corners STEP 2 Repeat Step 1 with the second Side Panel ensuring that the Side Panel overlaps the Back Wall Panel STEP 3 Stand up the Front...

Страница 12: ...ce and use 2 x 75mm screws to secure the Jack Studs to the underside of the Ridge Beam one at each end fig 1 Turn the Ridge Beam Jack Stud assembly over and place it on the timber Top Plate in a centr...

Страница 13: ...eet then using 1 x 40mm Weatherseal nail fix Roof Sheet through the pan into the Top Plate Repeat at the front ROOF ASSEMBLY CONT 12 STEP 4 Centralise the Roof at the right hand end with the Ridge Bea...

Страница 14: ...Plate and the concrete slab A 10mm masonry drill bit is required OPTIONAL SENTRY FLOOR Position the Floor Joists centrally between the side Base Plates and skew nail each end with two 75mm nails Chec...

Страница 15: ......

Страница 16: ...less than 200g m2 as published by Branz Warranty certificate being returned to manufacturer within 21 days of purchase together with proof of purchase This warranty does not cover the following Fasten...

Отзывы: