background image

 

 

ROOF  ASSEMBLY 

SELECT: 
 

4 x 2.200 m Roof Sheets 
2 x 2.055 m Spouting 
4 x 1.100 m Barges 
1 x 2.055 m  Ridge Flashing 
1 x 2.020 m Ridge Beam 
2 x 0.200 m Jack Studs 
8 x 75mm Screws 
31 x 40mm Weatherseal Nails 
58 x Rivets 
 

IMPORTANT—FOR SHEDS WITH OPTIONAL CLEAR 
ROOF PANEL 

 

Assemble as below, making sure that the Clear Roof Sheets 
overlap the standard roof sheets on both sides.  
The Clear Roof Panel must be secured to the Top Plate and the 
Ridge Beam. Pre drill and fasten with the 40mm weatherseal 
nails provided.

STEP 1: 

 



Place the Ridge Beam on a level surface and use 2 x 75mm 
screws to secure the Jack Studs to the underside of the Ridge 
Beam, one at each end (fig. 1). 

 



Turn the Ridge Beam /Jack Stud assembly over and place it on 
the timber Top Plate in a central position.  

 



Secure with 2 x  75mm screws through the top of the Jack Studs 
into the Timber Top Plate (fig. 2). 

STEP 2: 

 



Position the first roof sheet with the centre slots over the 
middle of the Ridge Beam. Gently fold the roof sheet over 
the Ridge Beam so that the ends touch the front & back Top 
Plates.  

 



Repeat with second roof sheet. 

 



Rivet sheets together at overlaps ,one  rivet either side of the 
ridge beam (fig. 3).  

 



Repeat with remaining roof sheets 

11 

JACK STUD 

TOP PLATE 

RIDGE BEAM 

fig. 1

 

fig. 2

 

SIDE 

WALL 

FRONT 

WALL 

BACK 

WALL 

SIDE 

WALL 

TOP 

BOTTOM 

RIDGE 

fig. 3

 

Содержание Duratuf SENTRY SHEDS SG2020

Страница 1: ...ASSEMBLY INSTRUCTIONS SG2020 BASE SIZE 2 020m x 2 020m...

Страница 2: ......

Страница 3: ...EQUIREMENTS Following are the minimum requirements for cladding used in Sentry Sheds Wash all surfaces annually using a hose and soft nylon brush Within 2 km of coast wash every 3 months as above Afte...

Страница 4: ...r Jamb 1 850 m 2 Roof 2 200 m 4 Door Brace 1 160 m 2 Door 3 4 Sheet 1 810 m 2 Ridge Flashing 2 055 m 1 TIMBER Barge 1 100 m 4 Bottom Plates H4 Green Front Back 2 020 m 2 Padbolt Support 0 140 m 1 Bott...

Страница 5: ...Side Back Wall Sheets Front Wall Sheet Door Jambs Front Wall Sheet Door Side Flashing Hinge Door Brace Door Top Bottom Ridge Beam Jack Stud Ridge Flashing 5 ASSEMBLE FRONT PANEL 6 ASSEMBLE WALLS 7 AS...

Страница 6: ...g through from underneath During construction you may raise the bottom timber plate to allow the wall cladding to protrude 20mm below the bottom plate This will stop water flowing between the bottom p...

Страница 7: ...flashings and assemble door as shown Drill and rivet as per diagram STEP 4 On the back of the door place door braces in posi tion as shown in fig 3 Ensure that the top and bottom ends of the braces ar...

Страница 8: ...s to the Top Plate at each end making sure that the top corners of the sheets are flush with the top of the Top Plate and that the sides of the wall sheet overhang the Top Plate by approx 15mm as show...

Страница 9: ...e using two clouts per pan STEP 4 Nail the wall sheets to the Bottom Plate at each end ensuring that each side of the wall sheets overhangs the Bottom Plate by 15mm and that the distance between the T...

Страница 10: ...nges to the Door Jamb Flashing ensuring door closes properly Fit remaining rivets STEP 3 Place 2 x Wall Sheets on timber Ensure that the top of the sheets are flush with the top of the Top Plate and t...

Страница 11: ...2 per join screw the Top and Bottom Plates together in the corners STEP 2 Repeat Step 1 with the second Side Panel ensuring that the Side Panel overlaps the Back Wall Panel STEP 3 Stand up the Front...

Страница 12: ...ce and use 2 x 75mm screws to secure the Jack Studs to the underside of the Ridge Beam one at each end fig 1 Turn the Ridge Beam Jack Stud assembly over and place it on the timber Top Plate in a centr...

Страница 13: ...eet then using 1 x 40mm Weatherseal nail fix Roof Sheet through the pan into the Top Plate Repeat at the front ROOF ASSEMBLY CONT 12 STEP 4 Centralise the Roof at the right hand end with the Ridge Bea...

Страница 14: ...Plate and the concrete slab A 10mm masonry drill bit is required OPTIONAL SENTRY FLOOR Position the Floor Joists centrally between the side Base Plates and skew nail each end with two 75mm nails Chec...

Страница 15: ......

Страница 16: ...less than 200g m2 as published by Branz Warranty certificate being returned to manufacturer within 21 days of purchase together with proof of purchase This warranty does not cover the following Fasten...

Отзывы: