12
Pub. No. 1243 — April 2008
RITE-HITE
®
STR-4100 DOK-LOK
®
Installation Manual
SPECIAL APPLICATION INSTALLATION ITEMS
72”
30”
30”
10”
NOTES:
a. Concrete pad required on all approaches of materials other than concrete.
b. Pad must be a minimum 10 inches thick. May need to repair due to sub-soil climatic conditions or location codes.
FIGURE 11 - CONCRETE PAD APPROACH