Dok‑Guardian™ HD Safety Barrier
Installation/Service/Owner's Manual
Rite‑Hite
®
6 Publication:
AMEN00033 2019-03-29
INSTALLATION
Change Orientation
Continued
Interlock Assembly (if equipped)
STORAGE SIDE WARDEN.
AS LEFT TO RIGHT PULL
RECEIVER SIDE WARDEN.
AS LEFT TO RIGHT PULL
Warden
Interlock Assembly
Latch Bracket
Left to Right pull
Right to Left pull
K
J
H
I
K
I
J
H
Back side
to flip zinc plate (H) end over
end and swap/relocate interlock actuator (I) and flat
screws (J) Reverse order to refasten
NOTE:
• Circuit board (K) is centered and does not get moved
•
DO NOT
overtighten nylock nuts Actuator should have
freedom of movement
•
Nylock nuts (provided with actuator) finish flush with the
screw end (L)
1
9
7
4
5
6
10 11
12
Shown: Back side (Left to Right pull)
L
2
Flush
8
L
Side View
Bottom View
ORDER
#
DESCRIPTION
QTY
1st
(2 places)
1 SHROUD,SW,INTRLCK,10MM,DKGRDN
1
2 SCR,RHMS,PHLP,#8-32X1,ZNC
2
3 NUT,HEX,SERRATED,#8-32X1/8",Z
2
2nd
4 PCB,ACTUATOR,DOK-GUARDIAN
1
5 STANDOFF,NYLON,PCB,ADHSV,1/4"
2
3rd
6 ACTR,12VDC,10MM,5MM/S,45N
1
7 LVR,LINKAGE,INTRLCK,DKGRDN
1
8 SCR,RHMS,PHLP,#8-32X3/4,ZNC
2
9 SHAFT, INTRLCK, STOP, 10MM, DKGRDN
1
4th
10 PLATE,INTRLCK,MNT,10MM,DKGRDN
1
11 WSHR,LOCK,SPLIT,#10,ZNC
4
12 SCR,RHMS,PHLP,#10-24X1/2,ZNC
4
5th
13 SCR,FHMS,SCKT,5/16-18X1
2
Figure 3
Figure 4