
Rinnai 16
RF1800 OIM
Fully Enclosed
Through Wall
There must be a clear
path for the flue to pass
Refer to
note on
top fixing
Platform
recommended
Allow at least
20mm gap for
power and gas
100
0
m
in
imu
m
re
co
mm
ende
d
Min
M
in
46
3
cla
dd
ing
495 Min
1000
ov
er
Mi
n
Min
715
Min
250
32
2
2210
26
3 m
in
Y piece flue is
shown, an
alternative is to
run two flues
through to
termination.
Refer to
note on
top fixing
Platform
recommended
Allow at least
20mm gap for
power and gas
This section must be fully
supported from above and
not place any load on the fire
2210 Min
m
in
imu
m
495 Min
1000
100
0
Min
250
re
co
mm
ende
d
Min
715
295 Min
over
cladding
There must be a clear
path for the flue to pass
Y piece flue is
shown, an
alternative is to
run two flues
through to
termination.