Rinnai 15
RF1800 OIM
Fully Open
Corner
Refer to
note on
top fixing
There must be a clear
path for the flue to pass
Platform
recommended
Allow at least
20mm gap for
power and gas
over
Min
250
m
in
imu
m
re
co
mm
ende
d
100
0
1000
cladding
Min
715
over
Min
M
in
46
3
Min
2183
cladding
468
322 Min
26
3 M
in
Y piece flue is
shown, an
alternative is to
run two flues
through to
termination.
There must be a clear
path for the flue to pass
Refer to
note on
top fixing
Platform
recommended
Allow at least
20mm gap for
power and gas
These sections must be fully
supported from above and
not place any load on the fire
Min
46
3
250
M
in
imu
m
Recommende
d
100
0
min over
295
cladding
1000
715 Min
M
in
468 over
cladding
2183 Min
Y piece flue is
shown, an
alternative is to
run two flues
through to
termination.