REU-VR2626WB (B26) /REU-VR2426WS (S26) /REU-VRM2626WG (INF26)
- 32 -
Issue 3 - 13/11/14 ©Rinnai
Gas Control
9)
Removal of
Flame rod and spark plug
a. Remove flame rod terminal and tighten sparker
lead.
b. Remove flame rod and spark plug.
a. Remove of High Tension lead
10)
Removal of
Outgoing Water Thermistor
a. Remove thermistor fixing screw.
b. Remove 2 pin connection outgoing water
thermistor
Heat Exchanger Thermistor
11)
Removal of
Heat Exchanger Thermistor
2632WC ONLY
a. Remove thermistor holder
b. Remove 2 pin connector
Содержание REU-VR2426WS Solar 26
Страница 16: ...REU VR2626WB B26 REU VR2426WS S26 REU VRM2626WG INF26 13 Issue 3 13 11 14 Rinnai 7 Operational Flow Chart...
Страница 50: ...REU VR2626WB B26 REU VR2426WS S26 REU VRM2626WG INF26 46 Issue 3 13 11 14 Rinnai...
Страница 51: ...REU VR2626WB B26 REU VR2426WS S26 REU VRM2626WG INF26 47 Issue 3 13 11 14 Rinnai...
Страница 52: ...REU VR2626WB B26 REU VR2426WS S26 REU VRM2626WG INF26 48 Issue 3 13 11 14 Rinnai...