
Convector 460/560PTR
- 26 -
©Rinnai
Heater OFF
ON/OFF Switch OFF
Display
Room Temp.
6
Time
SV1 SV2 OFF
Mod. valve OFF
C.M. (med) ON
C.M. OFF
OFF TIMER
ON/OFF switch ON
Air volume indicator
illuminates (auto)
Dust indicator
illuminates (Green)
Air Purification
motor Hi ON
OFF timer switch ON
OFF Timer indicator
illuminates (1 hour)
Set up time
has passed
OFF timer sw. change
No
ON/OFF Switch OFF
Air Purifying ON
Dust indicator OFF
Air Purification motor
OFF
Air volume Ind. OFF
Yes
Air Purifying OFF
ON/OFF switch ON
Air volume indicator
illuminates (auto)
Dust indicator
illuminates (Green)
Air Purification
motor Hi ON
14
Automatic
operation
Operation ceases
TIMER
(150~255 sec)
ON/OFF switch ON
Combustion A -> B
Timer switch ON
Display
Room Temp.
6
Time
SV1 SV2 OFF
POV OFF
C.M. (med) OFF
Timer Ind. illuminates
Operation/comb. Ind.
illuminates (Green)
C.M. OFF
Pre-heat
time
Timer Indicator flashes
*When Timer 1 or Timer 2 is set up, the heater
will operate 1 cycle per day. (Within dotted line)
Then Timer 1 and Timer 2 are set up, the heater
will operate 2 cycles per day. (Within dotted line)
Dust Ind.
lluminates (Orange)
All Indicators OFF
Combustion A -> B
No
No
Yes
Yes
Timer off
set up time
Air Purificaiton
motor med ON
Dust Ind.
illuminates (Green)
Air Purificaiton
motor Lo ON
Dust Ind.
illuminates (Red)
Air Purificaiton
motor Hi ON
Safety device
activated
Yes
No
No
Air volume ind
Lo-Med-Hi-Boost
Air purification motor
Lo-Med-Hi-Boost
Dust indicator
Green-orange-Red
15
Cause elimated
All indicators OFF
ON/OFF switch OFF
Air purification motor OFF
Dust indicator OFF
Air volume indicator OFF
05
Operation/combustion
indicator flashes (Red)
Pre-filter comes off
detection
16
Yes
Содержание RCE-460PTR
Страница 1: ...SERVICE MANUAL RCE 460PTR RCE 560PTR FAN CONVECTOR ...
Страница 16: ...Convector 460 560PTR 11 Rinnai 4 Dimensions Note All dimensions are in millimetres ...
Страница 17: ...Convector 460 560PTR 12 Rinnai 5 Installation The following clearances are recommended for installation ...
Страница 18: ...Convector 460 560PTR 13 Rinnai 6 Schematic Diagram ...
Страница 19: ...Convector 460 560PTR 14 Rinnai 7 Cut Away Diagram ...
Страница 20: ...Convector 460 560PTR 15 Rinnai 8 Operation Principles Control Panel Layout ...
Страница 29: ...Convector 460 560PTR 24 Rinnai ...
Страница 61: ...Convector 460 560PTR 56 Rinnai ...
Страница 62: ...Convector 460 560PTR 57 Rinnai ...
Страница 63: ...Convector 460 560PTR 58 Rinnai ...
Страница 64: ...Convector 460 560PTR 59 Rinnai ...
Страница 65: ...Convector 460 560PTR 60 Rinnai ...
Страница 66: ...Convector 460 560PTR 61 Rinnai ...
Страница 67: ...Convector 460 560PTR 62 Rinnai ...
Страница 68: ...Convector 460 560PTR 63 Rinnai ...
Страница 69: ...Convector 460 560PTR 64 Rinnai ...
Страница 70: ...Convector 460 560PTR 65 Rinnai ...