![Rinnai Neo RIB2310L Скачать руководство пользователя страница 22](http://html1.mh-extra.com/html/rinnai/neo-rib2310l/neo-rib2310l_operation-manual_1462804022.webp)
Rinnai New Zealand Ltd.
Neo Operation Manual: 11907-C
03-11
22
Commissioning
The installer must complete their installation details (p. 23) and commissioning checklist below,
and make sure this manual is left with you. They must also explain about the use and care of
the Neo and make sure you understand the safety instructions and operation of the appliance.
The glass dress guard fitted to this appliance reduces the risk of fire and injury and no
part of it should be permanently removed.
Checklist to be completed by a licensed gas fitter
1. Appliance positioned in a suitable location (clearances, combustible clearances,
mantels and surrounds etc.).
2. Rinnai flue system installed and tested to ensure effective draw.
3. Gas pressure checked and set.
4. Burn media installed as per instructions.
5. Glass dress guard fitted and customer advised not to remove.
6. Appliance tested for correct operation and to ensure no gas leaks.
7. Customer instructed on operating procedure and safety requirements.
8. Customer advised to service the heater every two years.
WARNING