background image

CORPORATION

2-26  Fukuzumi Nakagawa

Nagoya Japan

(TRJB11N-32)

Printed in Japan

RB-11N-C.indd   Sec2:7

RB-11N-C.indd   Sec2:7

2/10/2009   9:12:15 AM

2/10/2009   9:12:15 AM

Содержание JZY-11N

Страница 1: ...OPERATING INSTRUCTIONS MODEL JZ Y T 11N MODEL RB 11N C CERAMIC GLASS TOP BUILT IN HOB NAGOYA JAPAN CORPORATION RB 11N C indd 1 RB 11N C indd 1 2 10 2009 9 12 09 AM 2 10 2009 9 12 09 AM...

Страница 2: ...e best condition please read the instructions below carefully COMPONENTS AND PARTS NAMES Front Side Gas Inlet Battery 1 5V 1 size C 1 5 1 C Pan Support Drip pan Top Plate Casing Air Intake Guard RB 11...

Страница 3: ...m Body Weight 5 5 kg 12 1 1b BENCHTOP CUT OUT DIMENSIONS INSTALLATION Install the built in hob in a well ventilated room and keep it away from any combustible or infl ammable objects such as paper or...

Страница 4: ...een two appliances is required with all gaps being sealed It is to avoid the infl uence of air draught on the operation of the built in hob when the oven fan is running In case that a partition plate...

Страница 5: ...esirable setting 4 Flame can be adjusted between MAX and MIN Please adjust fl ame slowly 5 If the fl ame is extinguished while using the Flame Failure Safety Device will shut the gas off after a short...

Страница 6: ...and mild detergent For burnt and stuck dirt wipe by cloth with liquid cream cleanser Top Plate Cleaning Do not use sharp edge tool like screwdriver and polishing powder in order to prevent scratch to...

Страница 7: ...fter fl ame is ignited 3 No main fl ame 3 1 Gas meter cock and or appliance cock have been turned off Open gas meter cock and or appliance isolating cock completely 3 2 Burner head is blocked by alumi...

Страница 8: ...CORPORATION 2 26 Fukuzumi Nakagawa Nagoya Japan TRJB11N 32 Printed in Japan RB 11N C indd Sec2 7 RB 11N C indd Sec2 7 2 10 2009 9 12 15 AM 2 10 2009 9 12 15 AM...

Отзывы: