Continuous Flow Water Heater Operation Guide 04-12
|
21
Installer details
Company name:
Installer name:
Address:
Phone:
Mobile:
Certificate of compliance number for installation:
Signed:
Date:
Installer, please remember to complete and leave the commissioning checklist with the owner.