10
HOT WATER SUPPLY OPERATION
Ignition
Press ON/OFF Button of
Optional Remote Control
to turn on unit . The remote control display
and priority LED will light up. When a hot water tap is opened the
Water Flow Sensor
revolves
and sends a pulse signal to the
Printed Circuit Board (PCB.)
When the PCB detects a water
flow over 2.4 L/min it compares the temperature at the
Hot Water Thermistor
to the set point
and begins the ignition process; the
Combustion Fan
starts first. Once the chamber has been
purged and the air proving has made the
Electrode
begins to spark to Earth. The
Main
Solenoid Valve
and
Changeover Solenoid Valve 2
are opened and the
Burner
lights. The
Flame Rod
will ensure proper burning before
Changeover Solenoid Valve 1
will open.
Temperature Setting
With the
Temperature Control Buttons
on the controller the outlet temperature can be set from
37
-
60
℃
. When the temperature set point is above 50
℃
the
High Temperature Indicator
glows. Temperature can not be set above 48
℃
while hot water is in use (flowing.) The unit will
continually monitor the outgoing temperature and can fully modulate the performance with the
Modulating Valve
and the
Servo Control
.
Standby
When the hot water tap is closed the PCB no longer receives a pulse signal from the Water Flow
Sensor. The PCB shuts the Main Solenoid Valve
and Change-over Solenoid Valves and the
Burner extinguishes. The combustion fan will run on to post purge the chamber.
Schematic Diagram
Содержание FUA-E
Страница 1: ......
Страница 5: ...5 Glossary of Terms and Symbols ...
Страница 9: ...9 Dimensions ...
Страница 11: ...11 Structure Diagram ...
Страница 17: ...17 Gas Conversion Procedure ...
Страница 18: ...18 Gas Conversion Procedure ...
Страница 25: ...25 Operational Flow Chart ...
Страница 26: ...26 Time Charts ...
Страница 39: ...39 Diagnostic Checks Fault Finding Chart ...
Страница 40: ...40 Fault Finding Chart ...
Страница 41: ...41 Fault Finding Chart ...
Страница 42: ...42 Fault Finding Chart ...
Страница 43: ...43 Fault Finding Chart ...
Страница 44: ...44 Fault Finding Chart ...
Страница 45: ...45 Fault Finding Chart ...
Страница 46: ...46 Wiring Diagram ...
Страница 49: ...49 Dismantling for Service ...
Страница 50: ...50 Dismantling for Service ...
Страница 51: ...51 Dismantling for Service ...
Страница 52: ...52 Dismantling for Service ...
Страница 53: ...53 Dismantling for Service ...
Страница 54: ...54 Dismantling for Service ...
Страница 55: ...55 Dismantling for Service ...
Страница 56: ...56 Exploded Diagram ...
Страница 57: ...57 Exploded Diagram ...
Страница 58: ...58 Exploded Diagram ...
Страница 59: ...59 Exploded Diagram ...
Страница 60: ...60 Exploded Diagram ...
Страница 61: ...61 Parts List ...
Страница 62: ...62 Parts List ...
Страница 63: ...63 Parts List ...
Страница 64: ...64 Parts List ...
Страница 65: ...65 Letter of Compliance ...
Страница 66: ...66 CE Certificate ...
Страница 67: ......