7
Specification of 16i
Type of Appliance
Temp Controlled Continuous Flow Gas Water Heater
Operation
With / Without remotes (Kitchen, Bathroom, etc.)
Flue System
Room Sealed, Forced Draught Flue
Installation
Internally Mounted only
Available Temps
37C - 48C (1 deg Increments) 50, 55, 60
Width 370
mm
Dimensions Height
675
mm
Depth
130 + 45 mm
Weight
15
kg
Gas
1/2 in bsp
Connections
Cold Water
1/2 in bsp
Hot Water
1/2 in bsp
Ignition System
Direct Electronic Ignition
Noise Level
49 dB(A)
Nox
55 ppm Max
Water Temp Control
Simulation feed forward and feedback
Flame Failure
Flame Rod
Boil Dry
Water Flow Sensor
Remaining Flame
97 C bimetal switch
Safety Devices
Over current
Glass Fuse 3 Amp
Over pressure
Pressure Relief Valve 15 bar open, 12 bar close
Combustion Fan
Integrated circuit system
Fusible Link
150 C Thermal Fuse
Over temperature
Lockout Thermistor 95 C
Heater Mounted
MC-45-SR-EU
Remote Controls
Kitchen
BC-45-SR-EU or BSC-45-SR-EU
Bathroom BC-45-SR-EU or BSC-45-SR-EU
Remote Cable
Two core sheathed (double insulated) flex with min 0.55 mm
2
G20 Nat Gas Press Low
1.8 mbar
G20 Nat Gas Press High
9.0 mbar
G25 Nat Gas Press Low
1.8 mbar
G25 Nat Gas Press High
9.0 mbar
G30 LPG (Butane) Press Low
2.2 mbar
G30 LPG (Butane) Press High
11.4 mbar
G31 LPG (Propane) Press Low
2.2 mbar
G31 LPG Propane) Press High
14.2 mbar
Gas Consumption Low (Gross)
G20 Nat Gas
4.7 kW
0.4 m3/hr
G25 Nat Gas
4.0 kW
0.4 m3/hr
G30 LPG (Butane)
4.9 kW
0.35 kg/hr
G31 LPG (Propane)
4.9 kW
0.35 kg/hr
Gas Consumption High (Gross)
G20 Nat Gas
34.9 kW
3.26 m3/hr
G25 Nat Gas
29.6 kW
3.26 m3/hr
G30 LPG (Butane)
36.8 kW
2.6 kg/hr
G31 LPG (Propane)
36.5 kW
2.6 kg/hr
Max Flow raised 25C
15.2 L/min
Min Operation Flow
2.4* L/min
Water Pressure Nom.
1.1 - 7.0 bar
Power Supply
230 V / 50 Hz
Electric Consumption
68 Watts
Содержание FUA-E
Страница 1: ......
Страница 5: ...5 Glossary of Terms and Symbols ...
Страница 9: ...9 Dimensions ...
Страница 11: ...11 Structure Diagram ...
Страница 17: ...17 Gas Conversion Procedure ...
Страница 18: ...18 Gas Conversion Procedure ...
Страница 25: ...25 Operational Flow Chart ...
Страница 26: ...26 Time Charts ...
Страница 39: ...39 Diagnostic Checks Fault Finding Chart ...
Страница 40: ...40 Fault Finding Chart ...
Страница 41: ...41 Fault Finding Chart ...
Страница 42: ...42 Fault Finding Chart ...
Страница 43: ...43 Fault Finding Chart ...
Страница 44: ...44 Fault Finding Chart ...
Страница 45: ...45 Fault Finding Chart ...
Страница 46: ...46 Wiring Diagram ...
Страница 49: ...49 Dismantling for Service ...
Страница 50: ...50 Dismantling for Service ...
Страница 51: ...51 Dismantling for Service ...
Страница 52: ...52 Dismantling for Service ...
Страница 53: ...53 Dismantling for Service ...
Страница 54: ...54 Dismantling for Service ...
Страница 55: ...55 Dismantling for Service ...
Страница 56: ...56 Exploded Diagram ...
Страница 57: ...57 Exploded Diagram ...
Страница 58: ...58 Exploded Diagram ...
Страница 59: ...59 Exploded Diagram ...
Страница 60: ...60 Exploded Diagram ...
Страница 61: ...61 Parts List ...
Страница 62: ...62 Parts List ...
Страница 63: ...63 Parts List ...
Страница 64: ...64 Parts List ...
Страница 65: ...65 Letter of Compliance ...
Страница 66: ...66 CE Certificate ...
Страница 67: ......