
12
|
Evolve 950 Installation Guide: 12471-A 01-14
Evolve 950 installation overview
1.
Construct frame as per enclosure
dimensions on p. 8.
2.
Line wall—could also plaster at
this stage.
3.
Complete the gas connection
refer p. 6. Electrical supply can
also be completed at this point.
4.
Connect flue system.
5.
Install heater into enclosure,
screw to frame, and complete
gas, air hose, and flue
connection p. 14.
6.
Install burn media, refer p 16-19.
8.
Install outer frame, mesh guard
(if purchased), and inner frame
refer p. 21.
11. Complete installation checklist
in operation guide and complete
customer handover—add a
touch of magic!
7.
Commission unit, refer p. 20.
9.
Test operation and lighting
sequence, refer p. 22.