background image

Rinnai 

Ducted Gas Heater IM

NOTE

The manufacturer cannot guarantee compatibility and support for anyone using 3rd party 

accessory/devices (device) on any of their appliances.  
The suitability, compatibility or functional performance of any 3rd party device is entirely the 

responsibility of the device’s supplier or installer. 
Any 3rd party device, technical, installation, operation, performance or other enquiries need to be 

referred to the device’s supplier or installer. 

Any  adverse  effects  of  3rd  party  devices  on  the  operation,  performance  or  reliability  of  this 

appliance is not covered by the manufacturer’s product warranty. 

WARNING

MANDATORY INSPECTION PRIOR TO INSTALLATION

Immediately report any damage or discrepancies to the Supplier of the appliance. This 

appliance was inspected and tested at the time of manufacture and packaging, and released for 

transportation without known damage. Upon receipt, inspect the exterior for evidence of rough 

handling in shipment. Ensure that the appliance is labelled correctly for the gas and electrical 

supply, and/or other services it is intended to be connected to.   

For safety and warranty purposes, appliances that may be damaged or incorrect must not be 

installed or operated under any circumstances.  Installation of damaged or incorrect appliances 

may contravene local government regulations.  Rinnai disclaims any liability or responsibility 

whatsoever in relation to the installation or operation of damaged or incorrect appliances.

Содержание brivis StarPro BX5

Страница 1: ...StarPro Ducted Gas Heater Installation Manual Models BX5 SP4UN BX5 SP4UN...

Страница 2: ...4254 HB 276 2004 Local Regulations and Municipal Building Codes including local OH S requirements This appliance must be installed maintained and removed only by an Authorised Person For continued saf...

Страница 3: ...nces 12 3 4 Service Clearances External 13 3 4 1 Installation of Flashing 13 3 4 2 SP4UN External Clearances 13 3 4 3 BX5 Service Clearances 13 4 Heater Configuration 15 4 1 Heater Duct Pop Installati...

Страница 4: ...9 2 2 Connect a Manual Thermostat 29 10 Networker Installation Single and Multiple Connections 31 10 1 Networker Installation 31 10 2 Connect a Networker to SP4UN or BX5 Series Heaters 31 10 3 Connect...

Страница 5: ...ectricity Authorities SuperSizeGuide Building Code of Australia BCA including local OH S requirements Environment Authorities This appliance must be installed maintained and removed by an Authorised P...

Страница 6: ...ATORY INSPECTION PRIOR TO INSTALLATION Immediately report any damage or discrepancies to the Supplier of the appliance This appliance was inspected and tested at the time of manufacture and packaging...

Страница 7: ...qualified personnel This manual applies to the following models 5 Series 4 Series Heaters External Universal BX520EN SP415UN BX526EN SP421UN SP430UN SP435UN 1 1 SP4UN Heater Overview SP4UN series heat...

Страница 8: ...ve best practice can lead to costly call backs for installers unnecessary manufacturer warranty calls and a poor customer experience With our policy of continuous improvement we reserve the right to c...

Страница 9: ...ment or the Technical Specifications at the rear of this manual NOTE All installations should only be carried out by a qualified tradesperson Installations at altitudes above 1000m above sea level may...

Страница 10: ...required incoming gas pressure at maximum consumption with all other gas appliances operating at their maximum capacity at the same time as the heater 2 5 2 Electrical Power Supply The heater is pre...

Страница 11: ...UN 14 549 197 235 644 491 497 923 237 250 515 487 350 350 SP435UN 14 549 197 235 644 491 497 923 237 250 515 487 400 400 NOTE SP4 Universal models are approved for internal or external applications 3...

Страница 12: ...d 2 In Ceiling and Under Floor Diagram 4 Method 2 Clearances Method 3 Lay down Option In Ceiling Diagram 5 Method 3 Clearances 750mm Minimum Fan Cabinet Heat Exchanger Cabinet 250 mm Minimum 750mm Min...

Страница 13: ...st be provided at each end of the heater Top A minimum of 1000mm must be provided above the heater roof This clearance must be maintained for the entire surface area of the heater roof Diagram 7 Exter...

Страница 14: ...r IM Diagram 8 BX5 Clearances 1000 mm min 500 mm min Service Clearance 500 mm min 300 mm min 300 mm min Side View Plan View Service Clearance Service Clearance Top Front Front End End Flashing HEATER...

Страница 15: ...can be repositioned to move the duct outlet inlet to the back or to the side of the unit to suit the specific installation Change Duct Connection Locations Simplistically the heater unit is made up of...

Страница 16: ...ll the lid IMPORTANT RETURN AIR CONNECTION AT THE END OF THE UNIT REAR ENTRY F3 Connecting the return air duct to the end of the unit reduces the rated airflow by up to 30 The total number of outlets...

Страница 17: ...eed tube as follows a Change the pop duct connection locations as required This ensures the pre cut blanking plate is removed from the correct cabinet panel b Remove the pre cut blanking plate coverin...

Страница 18: ...ter being installed Diagram 10 Wall Cut out Area 5 2 SPLITTING HEATER FOR ASSISTED LIFTING AND POSITIONING Not applicable BX5 Models The SP4UN series heaters can be split for ease of installation 5 2...

Страница 19: ...el maintained from the access opening to the heater All under floor installations must be on a level concrete base 50mm thick and provision made to drain any condensate seepage or ground water away fr...

Страница 20: ...he space additional ventilation is required Refer to AS NZS 5601 for natural ventilation requirements NOTE For New Zealand ventilation requirements and all other applications e g Mechanical Ventilatio...

Страница 21: ...non corrosive metal flue suitably terminated All flues shall have a bolted flue sleeve connection to allow for repairs and or removal of the appliance Twin Wall flue maximum flue length of 6m Single...

Страница 22: ...rom the edges of the flue the following minimum clearances exist which are in accordance with AS NZS 5601 75mm Out from the wall against which it is mounted From a drain or soil pipe 300mm From a flue...

Страница 23: ...d more than 3m away from the heater an additional duct joiner installer supplied will be required so that the thermistor assembly can be fitted correctly Install the joiner between 1m and 3m away from...

Страница 24: ...ush up to the inner face of basebox First hole with mounting screw supplied Heater Coil up excess loom Base box NOTE The thermistor bracket is affixed with supplied mounting screw at the discharge pop...

Страница 25: ...nsor NOTE It is important that the ducting should be well insulated It is mandatory under building codes to install insulated fire rated duct 8 2 RETURN AIR GRILLE If a filter is fitted to the return...

Страница 26: ...one outlet fully open and another outlet half open for example in a bathroom Refer to Section 12 2 The outlet chart is divided into four columns as follows A The maximum number of outlets that should...

Страница 27: ...UN 621 10 12 6 2 SP430UN 918 16 23 7 2 SP435UN 1004 17 23 7 3 BX5 Heaters External BX520EN 300mm 605 10 12 5 2 BX520EN 350mm 667 12 13 6 2 BX526EN 350mm 944 16 23 7 2 BX526EN 400mm 1011 17 23 7 3 Mode...

Страница 28: ...from warm air outlets such as radiation from the sun fireplaces radio and television sets and nearby warm pipes and ducts Avoid Cold Spots Keep the thermostat away from draughts such as from doorways...

Страница 29: ...ront cover and connect the wires to thermostat terminals A and B d Ensure the thermostat batteries are correctly installed and mount the thermostat level on the wall refer to and follow the installati...

Страница 30: ...Ducted Gas Heater IM Diagram 17 SP4UN Series Manual Thermostat R W Manual Thermostat SP4UN Series Control Module Diagram 18 BX5 Manual Thermostat Manual Thermostat BX5 Terminal Block W R THERMOSTAT IN...

Страница 31: ...he wires from the wall cavity and feed them through the opening in the backing plate d Connect the cable to the terminal connections on the backing plate before mounting it on the wall and reassemblin...

Страница 32: ...series heater to provide dual controls This is particularly useful with adaptive zoning to enable dedicated zone control For example one networker can be used to control one zone while the other netwo...

Страница 33: ...rom slave networkers Therefore after a networker is configured as a slave the master networker must be used to access the parameters Diagram 22 Networker Identification Networker ID Parameter Value 10...

Страница 34: ...12 socket connectors preconfigured for Belimo 24V damper motors RJ Socket Connections The plastic cover on the PCB includes moulded cut outs to enable access to the RJ12 socket For each socket to be u...

Страница 35: ...LE Diagram 25 24VAC Power Open Power Close Damper Motor Diagram 26 24VAC Power Open Spring Return Damper Motor Diagram 27 240VAC Power Open Power Close Damper Motor ZONE B ZONE A N C 0V N O N C 0V N O...

Страница 36: ...be adjusted from 500 to 1350 3 H01 ID03 950 HEATING ZONING MINIMUM FAN SPEED SETTING The minimum RPM to which the fan will operate with the maximum number of outlets closed with the networker zoning i...

Страница 37: ...is flashing b Press and hold Key 2 and Key 4 until Installer parameter access displays c After the message clears press the mode key M to toggle between networker parameters n01 and heater parameters...

Страница 38: ...tion attempts and lock out with an error code If this occurs take note of the code and reset the heater refer to the Operation manual Initially the fan will run at a low speed approximately 500 RPM an...

Страница 39: ...rature to achieve a 35 to 40 C rise and avoid modulation If the heater still reaches the thermistor set temperature or the rise is greater than 40 C increase the fan speed c With a ceiling outlet syst...

Страница 40: ...em j Issue any required documentation to the relevant people authorities in regard to the installation of the heater the gas connection and the power supply For example a Certificate of Compliance and...

Страница 41: ...Pressure Lost 60 6 0 Motor Open Circuit 69 6 9 Fuse Blown 24Vac 2A 50 5 0 Ignition Lockout 51 5 1 Rollout No Gas 54 5 4 Rollout Lockout 56 5 6 Pressure Switch Stuck Open 57 5 7 Pressure Switch Stuck...

Страница 42: ...3 550 522 498 65 315 4 2 6 10 SP430UN Internal 130 N A 30 N A 350 0 31 0 47 1010 984 953 918 84 650 4 3 6 15 SP430UN External 130 N A 30 N A 350 0 31 0 47 919 895 867 835 84 650 4 3 6 15 SP435UN Inter...