![Rinnai brivis StarPro BX5 Скачать руководство пользователя страница 12](http://html1.mh-extra.com/html/rinnai/brivis-starpro-bx5/brivis-starpro-bx5_installation-manual_1462628012.webp)
Rinnai 12
Ducted Gas Heater IM
3.3 SERVICE CLEARANCES – INTERNAL
3.3.1 Service Clearance Notes
All SP415UN and SP421UN models can be installed in accordance with 'Method 1', 'Method 2', 'Method 3' and
'Method 4' below. The SP430UN and SP435UN can be installed in accordance with 'Method 1' and 'Method 2' only.
3.3.2 Internal Clearances
Method 1: In Ceiling and Under Floor
Diagram 3. Method 1 Clearances
Method 2: In Ceiling and Under Floor
Diagram 4. Method 2 Clearances
Method 3: Lay-down Option – In Ceiling
Diagram 5. Method 3 Clearances
750mm
Minimum
Fan
Cabinet
Heat
Exchanger
Cabinet
250 mm
Minimum
750mm
Minimum
Service Clearance
Heat
Exchanger
Cabinet
Fan Cabinet
Platform
Side View
Plan View
Fan
Cabinet
Heat
Exchanger
Cabinet
800 mm
Minimum
Platform
Service Clearance
Heat
Exchanger
Cabinet
Fan Cabinet
750mm
Minimum
Side View
Plan View
Fire resistant board
(refer to AS5601)
700 mm
750 mm
300 mm (refer to AS5601)
Side View
Service
Clearance
(Full length of heater)
HEATER DIMENSIONS AND CLEARANCES