10 POINT TO POINT testing
To perform a POINT TO POINT test, press
from HOME screen.
Select
to perform a point to point earth bond test
Select
to perform a point to point leakage test
Select
to exit the point to point function and return to the HOME screen
Select
will perform a standard insulation test
Connect the POINT TO POINT probes between the BLACK and GREEN socket
on the back panel. The EUT socket will power up during leakage tests however
the mains cable is not part of the measurement circuit hence it is shown as
optional and not required. The POINT TO POINT test is ideal for earth bond
testing on larger and or fix installed installations.
Connection between EUT and SafeTest 60;
POINT TO POINT TESTING