background image

 

2

 

 

ME12973A

 

 

 

2.    Cryogenic gas suction attachment - installation and adjustment 

2.1    Wiring the electric power supply cable 

(1)  Turn on the power of the 

XtaLAB mini

 and water chiller system. 

(2)  Launch

 CrystalClear 

and login. After logging in the dialog window 

Open sample

 will be 

displayed. Click the 

Cancel

 button. 

(3)  Click the 

Manual Instrument Control

 under the menu bar item 

Instrument

.   

(4)  Click the 

Initialize

 button in the

 Manual Instrument Control

 dialog window to get 

synchronization between goniometer and software.   

(5)  Move the Omega axis to 90 degrees. 

(6)  Close the 

CrystalClear

 software and turn off power to the 

XtaLAB mini

 and the water chiller 

systems. 

(7)  Remove the collimator and beam stop from the 

XtaLAB mini

 and mount the protective cover 

on to the face of the detector (Fig.2).   

 

(8)  Remove the nozzle of Low-Temperature Gas Cooler from the 

XtaLAB mini

.   

(9)  Remove the X-ray enclosure of the 

XtaLAB mini

(10) Remove the three screws on the goniometer cover (Fig.3) and remove the goniometer cover.   

 

Fig.3 Screws on goniometer cover 

Fig.2 Detector face cover 

Detector face cover 

(

XtaLAB mini

 accessory) 

Содержание XtaLAB mini

Страница 1: ...Cat No 2366A201 XtaLAB mini Cryogenic gas suction attachment Instruction manual Manual No ME12973A02...

Страница 2: ...ual has to be purchased for each product If there are any missing or incorrectly collated pages in the delivered instruction manual please contact the sales representative who you purchased the instru...

Страница 3: ...view 1 2 Cryogenic gas suction attachment installation and adjustment 2 2 1 Wiring the electric power supply cable 2 2 2 Fine alignment of the cryogenic gas suction pipe 5 2 3 Evaluate operation and p...

Страница 4: ......

Страница 5: ...cold gas flow and reduce the amount of ice accumulation Please refer to or read other manuals including XtaLAB mini system Maintenance Manual 11568C and CrystalClear Ver 2 0 0 for CCD system for Smal...

Страница 6: ...alog window to get synchronization between goniometer and software 5 Move the Omega axis to 90 degrees 6 Close the CrystalClear software and turn off power to the XtaLAB mini and the water chiller sys...

Страница 7: ...be 12 Confirm the cable at the rear side of goniometer goes through the hole along the Omega axis Pass the cable through the wiring duct Fig 5 near the USB ports at the rear of the XtaLAB mini 13 Remo...

Страница 8: ...the suction pipe when switching on the cryogenic gas suction at the left Mount the pipe such that the height from the top to the main body is around 56 mm Fig 8 Fix the suction pipe into the main bod...

Страница 9: ...and beam stop 2 2 Fine alignment of the cryogenic gas suction pipe 1 Turn on the switch on the main body of cryogenic gas suction 2 Turn on the power of XtaLAB mini and the water chiller system 3 Lau...

Страница 10: ...according to the following conditions for one image within flow bar step Initial Images Start Angle End Angle Width Exposure time sec 30 31 1 0 16 3 Inspect the image and make sure there is not a sha...

Страница 11: ...tion Rigaku Americas Corporation Rigaku Europe SE Head Office 3 9 12 Matsubara cho Akishima shi Tokyo 196 8666 Japan Phone 81 42 545 8189 Fax 81 42 544 9223 e mail rinttyo rigaku co jp 9009 New Trails...

Отзывы: