Tapes geometry measurement system
[Version 1.0] 08
th
December 2014
15
12. Maintenance
12.1. General instructions
Maintenance of the system is carried out to ensure constant-ready status and
continued availability of its work and to prevent premature failure. Maintenance includes
preventive measures aimed at identification and elimination of defects and to ensure the
normal operation while installation and working. It is recommended to conduct the daily,
weekly and annual maintenance work.
12.2. Safety precautions
During the installation maintenance security measures outlined in the Paragraph
1 should be observed.
12.3. Maintenance procedure
12.3.1. Daily maintenance work
Daily maintenance includes:
visual inspection of the system
checking of completeness,
checking for any damage of the structural elements, power and instrument
cables, indicators and connectors,
weakening of screw connections and insulation failures,
before starting work, it is necessary to clean the output micrometer windows
with a soft dry cloth.
12.3.2. Regular maintenance work
Regular maintenance work includes:
cleaning of micrometer windows with a dry soft lint-free cloth from contamina-
tion of dirt.
12.3.3. Yearly maintenance work
Authenticated calibration of the micrometers should be made once a year.
12.4. Operability test
It is recommended to conduct the functional test at least once at the beginning or
during the shift, for what it is necessary to complete full cycle control of the geometrical
parameters of the control sample (not supplied).
13.
Warranty policy
Warranty assurance for the Tape measurement system - 12 months from the
date of putting in operation; warranty shelf-life - 12 months.