20
HEATING ENGINEER
A
RTQ 3S
r
steel boilers come in
3 separate crates:
1) BOILER BODY CRATE
to which is attached the
documentation envelope (A) containing:
- Instruction manual
- Data label (to be applied to the casing on comple-
tion of the installation)
- Water test certificate
- Bar code labels
- Spare parts catalogue
b
The instruction manual is an integral part of the
boiler. Once located, read it thoroughly and keep it
safe.
2) THE CASING PANELS
complete with assembly
accessories (2 packs for models RTQ 448÷1600 3S
and 3 packs for models RTQ 2100÷2400 3S).
3) THE FRONT COVER
to fit on top of the front door.
IMPORTANT
For the boiler to function correctly, it must be connected
to a
r
TECH
control panel and dedicated control
accessories.
Unpacking the product
UNPACKING THE PRODUCT
HEATING ENGINEER