13
20158125
GB
Installation
5.6
Boiler fixing
Put on the flange 1)(Fig. 6) the screw and two nuts.
Widen, if necessary, the insulating gasket holes (5), (see
Fig. 7).
Fix the flange 1)(Fig. 8) to the boiler door 4) using screws 2)
and (if necessary) the nuts 3) interposing the insulating gas-
ket 5).
Prepare a suitable lifting system.
E9187
1
Fig. 6
WARNING
The seal between burner and boiler must be
airtight.
Fig. 7
D5012
Fig. 8
5
1
2
4
3
E9188
2
Содержание RDB 3.2 BT 58/70
Страница 2: ...Original instructions...