![Riello PRESS 200 T/N Скачать руководство пользователя страница 45](http://html1.mh-extra.com/html/riello/press-200-t-n/press-200-t-n_installation-use-and-maintenance-instructions_1459633045.webp)
5840
4
GB
2.3
DIMENSIONS
2.4
FIELD OF OPERATION
(3 nozzles in operation)
D2818
Burner
COMBUSTION HEAD PROJECTION
For the combustion head projection, carefully follow
the boiler manufacturer's indications.
For boilers with front smoke box, make a proper
protection with refractory material on the part of
the combustion head projecting into the combus-
tion chamber.
A spacer is available, upon request.
*
890
242
352
462
900
396
99
46
7
Diam 2
5
0
*
Boiler front plate hole
260
M16
260
255
D2760
Thermal power
Pre
ssur
e
in
c
ombus
tion
c
hambe
r – mbar
When the burner operates with only one or two nozzles, the pressurization conditions are improved and no
problems arise.
kg/h
kW
D2761
safety
limit
FIELD OF OPERATION: