
INSTALLATION
13
ASSEMBLY OF THE INSULATION AND THE LINING
4
1
5
6
8
9
7
1
2
1
2
2
3
3
1
2
1
5
The assembly of the insulation and lining components
must be performed at the site of installation to facilitate
passage through any doors and/or entries to the room.
Proceed as follows:
- Assemble the insulating covers (1) around the body of
the heater, making sure that the engagement points on
the edges are positioned correctly. The edges are not
required to be closed completely
- Place the front protection plate (2) correctly on the
attachments
- Place the rear protection plate by closing the interlo-
cking flaps (3) without closing completely (leave one
tooth open)
- Put the washers on the attachments (4)
- Cut the top insulation (5) and apply it
- Apply the insulation (6)
- Close the interlocking flaps (3) completely, which were
previously left with an open tooth
- Apply the upper insulation (7) and the upper cover (8)
(in order to insert the cover, exert a light and homoge-
neous pressure)
- Secure the top half-discs (9) with the screws supplied
- Apply the technical data plate and serial number plate
If disassembling is required, proceed in reverse order.
b
Wear suitable personal protective equipment
and use suitable safety devices.
a
Do not dispose of packaging material into the
environment, or leave it within the reach of
children, since it can become a potential hazard.
Dispose of packaging material in compliance
with applicable legislation.
Содержание KOMBI 1000
Страница 1: ...cod 20145353 rev 1 05 2018 KOMBI EN INSTALLATION OPERATION AND MAINTENANCE MANUAL...
Страница 2: ...2 RANGE MODEL CODE KOMBI 800 20145308 KOMBI 1000 20145313...
Страница 23: ......